My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-04-09-minutes-solid-waste
>
Meetings
>
2019
>
05. May
>
2019-05-07 10:00 AM - Commissioners' Agenda
>
2019-04-09-minutes-solid-waste
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 12:53:02 PM
Creation date
5/12/2020 12:50:11 PM
Metadata
Fields
Template:
Meeting
Date
5/7/2019
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
53395
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION C. PLANT OPERATIONAL CHARACTERISTICS <br />1. For each process listed in B.Ithat generates wastewater, list the process, assign the waste stream a name <br />and ID #, and describe whether it is a batch or continuous flow. <br />2. On a separate sheet, produce a schematic drawing showing production processes and water flow <br />through the facility and wastewater treatment devices (label as attachment C2). The drawing should <br />indicate the source of intake water and the operations contributing wastewater to the effluent and <br />should label the treatment units. Construct the water balance by showing average flows between <br />intakes, operations, treatment units, and points of discharge to land. If a water balance cannot be <br />determined (e.g., for certain mining activities), provide a description of the nature and amount of any <br />sources of water and any collection or treatment measures. <br />What is the highest daily discharge flow from the <br />processing facility: <br />( Specify the time period for the value given) <br />What is the highest daily discharge flow to the <br />sprayfelds/infiltration basin: <br />(Specify the time period for the value given) <br />What is the highest average monthly discharge <br />flow (daily flows averaged over a month) from the <br />processing facility: <br />(Specify the time period for the value given) <br />What is the highest average monthly discharge <br />flow to the sprayfields: <br />(Specify the time period for the value given) <br />0 gallons per Day <br />0 inches/acre/month OR <br />0 gallons per day <br />0 gallons/day? <br />0 inches/acre/month OR <br />0 gallons per day <br />Describe any planned wastewater treatment or sprayfield/infiltration improvements and the schedule <br />for the improvements or changes. (Use additional sheets, if necessary and label as attachment C4.) <br />N/A <br />ECY-040-179 (rev. 08/2012) Page 4 of 21 <br />Waste Stream <br />Batch (B) or <br />Process <br />Waste Stream Name <br />ID# <br />Continuous (C) <br />Process <br />Receiving raw potatoes <br />Mud Water <br />1 <br />C <br />(Example) <br />Ellensburg and Cle Elum <br />Transfer station Leachate <br />1 <br />Batch <br />Transfer stations <br />N/A <br />Pautzke Bait Company <br />2 <br />Batch <br />Process Wastewater <br />N/A <br />Septage Supernate <br />3 <br />Batch <br />N/A <br />Wastewater <br />4 <br />Batch <br />Landfill Leachate <br />Leachate pumped from closed <br />5 <br />Batch <br />landfill <br />2. On a separate sheet, produce a schematic drawing showing production processes and water flow <br />through the facility and wastewater treatment devices (label as attachment C2). The drawing should <br />indicate the source of intake water and the operations contributing wastewater to the effluent and <br />should label the treatment units. Construct the water balance by showing average flows between <br />intakes, operations, treatment units, and points of discharge to land. If a water balance cannot be <br />determined (e.g., for certain mining activities), provide a description of the nature and amount of any <br />sources of water and any collection or treatment measures. <br />What is the highest daily discharge flow from the <br />processing facility: <br />( Specify the time period for the value given) <br />What is the highest daily discharge flow to the <br />sprayfelds/infiltration basin: <br />(Specify the time period for the value given) <br />What is the highest average monthly discharge <br />flow (daily flows averaged over a month) from the <br />processing facility: <br />(Specify the time period for the value given) <br />What is the highest average monthly discharge <br />flow to the sprayfields: <br />(Specify the time period for the value given) <br />0 gallons per Day <br />0 inches/acre/month OR <br />0 gallons per day <br />0 gallons/day? <br />0 inches/acre/month OR <br />0 gallons per day <br />Describe any planned wastewater treatment or sprayfield/infiltration improvements and the schedule <br />for the improvements or changes. (Use additional sheets, if necessary and label as attachment C4.) <br />N/A <br />ECY-040-179 (rev. 08/2012) Page 4 of 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.