Laserfiche WebLink
CITY OF CLE ELUM <br />Zone 3 to Zone 2 Pressure Reducing Valve Station <br />8/512019 <br />Engineer's Opinion of Construction Cost <br />HLA Projecl W.1SIDIE <br />Item <br />No. Daso{ption <br />speccMeaticn <br />Unit Unit Cast Olu�ity <br />Overall Cost <br />1 Mtnur Change <br />1-04.4(9_] <br />FA $5,000.00 <br />1 <br />$5.0D0.00 <br />2 Moblllzation ' <br />1-08.7 <br />La $2 XO,DJ0l <br />1 <br />x,400.00 <br />3 Uleering end Gni ng <br />2-01.5 <br />LS SMO.Do. <br />1 <br />$500.00 <br />4 undassfried Excovefinn Incl. Haul <br />2-03.5 <br />CY $35.00 <br />45 1 <br />$1,575.00 <br />SPressure Radutang Valve Station -Complete, In Place <br />T-12,5 <br />LS $77,000.00 <br />1 <br />377,0p0 00 <br />Subk tel <br />$$6,37500 <br />Sales Tax 8.0% <br />$6,310.00 <br />Contingency 10% <br />381300.00 <br />Total <br />Estimated Construction Cost <br />$102,365.00 <br />Construction Engineering 15% <br />$15,390.00 <br />Total EAtlmsbd I■roJeat Cost <br />$717,975.00 <br />G VROJECTSM18118101MEnglwers EotlmaW - W sW8 Sewer Irr0rowememstWa1erConWuWw Goss Estimate • Zone 3 to Zane 2 ARV Siaiton.xex <br />