Laserfiche WebLink
June 6, 2019 <br />Jacobs Engineering <br />JE <br />BIG BOULDER CREEK BRIDGE <br />REPLACEMENT <br />Env. Group <br />Lead <br />Env. Project <br />Mana er <br />Permit <br />Lead <br />Sr. <br />Cultural <br />Cultural <br />Field <br />Tech <br />Env. <br />Engineer <br />Jr <br />Biologist <br />Technical <br />Editor <br />gdmin <br />Item <br />SCOPE OF WORK <br />$162.07 <br />$117.18 <br />$82.81 <br />$186.52 <br />$68.60 <br />$82.39 <br />$82.81 <br />$111.60 <br />$61.25 <br />7 <br />PROJECT MANAGEMENT <br />Labor Subtotal: <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />$0 <br />2 <br />STRUCTURAL ENGINEERING <br />Labor Subtotal: <br />0 <br />1 0 1 <br />0 <br />1 0 <br />O—L <br />a <br />0 <br />0 <br />0 <br />$0 <br />GEOTECHNICAL ENGINEERING <br />Labor Subtotal: <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />$0 <br />4 <br />HYDRAULIC ENGINEERING <br />Labor Subtotal: <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />$0 <br />5 <br />ENVIRONMENTAL DOCUMENTATION 8, <br />PERMITTING <br />5.10 <br />Project Management <br />2 <br />14 <br />4 <br />$2-210 <br />5.20 <br />Agency Coordination <br />3 <br />5 <br />$1 072 <br />5.30 <br />NEPAISEPA Documentation <br />1 <br />5 <br />30 <br />$3232 <br />5.40 <br />Biological Assessment <br />40 <br />20 <br />96 <br />5 <br />$17.334 <br />5.50 <br />NHPA Section 106 Evaluation <br />1 <br />4 <br />2 <br />5o <br />2 <br />$4-657 <br />5.60 <br />JARPA Package Preparation and Submittal <br />1 <br />5 <br />40 <br />10 <br />5 <br />2 <br />$5.522 <br />5.70 <br />Local Permits and Approvals <br />1 <br />3 <br />16 <br />.51839 <br />5.80 <br />Biology Support During Construction (Optional) <br />2 <br />40 <br />$3-547 <br />5.90 <br />Pe-rnit Update - 60' Bridge <br />5 <br />8 <br />14 <br />20 <br />40 <br />$7867 <br />Labor Subtotal: <br />54 <br />66 <br />100 <br />2 <br />50 <br />30 <br />— — <br />181 <br />9 <br />4 <br />$47,280 <br />$705 <br />6 <br />CIVIL ENGINEERING <br />LaborL4Subttoft.,al: <br />Labor bUM:1 <br />0 <br />54 <br />0 <br />55 <br />0 <br />1 UU <br />0 <br />L <br />0 <br />bu <br />0 <br />30 <br />0 <br />I i37 <br />0 <br />y <br />0 <br />1 4 <br />$0 <br />$4I,Lau <br />Reimbursable Sum: <br />$705 <br />lqm Page 4 of 4 <br />