My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-06-10-minutes-public-works-study-session
>
Meetings
>
2019
>
06. June
>
2019-06-18 10:00 AM - Commissioners' Agenda
>
2019-06-10-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 12:40:47 PM
Creation date
5/12/2020 12:36:06 PM
Metadata
Fields
Template:
Meeting
Date
6/18/2019
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
54424
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
June 6, 2019 <br />Watershed Science & Engineering <br />WSE <br />BIG BOULDER CREEK BRIDGE <br />REPLACEMENT <br />Principal <br />Senior <br />Engineer 1 <br />.Junior <br />Engineer <br />Contract <br />Administrator <br />Nem <br />SCOPE OF WORK <br />$212.99 <br />$189.66 <br />$97.37 <br />$94.93 <br />1 <br />PROJECT MANAGEMENT <br />Labor Subtotal: <br />o <br />0 <br />0 <br />0 <br />$0 <br />2 <br />STRUCTURAL ENGINEERING <br />Labor Subtotal: <br />0 <br />0 <br />0 <br />0 <br />$o <br />GEOTECHNICAL ENGINEERING <br />4 <br />Labor Subtotal: <br />n 1��51L�EfL`•Le <br />HYDRAULIC ENGINEERING <br />0 <br />0 <br />0 <br />_ <br />0 <br />$o <br />4.10 <br />Data Collection and Review <br />2 <br />8 <br />$1,245 <br />4.20 <br />Site Inspection <br />8 <br />8 <br />$2483 <br />4.30 <br />Channel Survey <br />2 <br />4 <br />$815 <br />4.40 <br />Hydrology <br />2 <br />4 <br />$815 <br />4.50 <br />Hydraulic Analysis <br />2 <br />1 <br />20 <br />$2:562 <br />4.60 <br />Channel Stability and Scour Assessment <br />10 <br />16 <br />$3.688 <br />4.70 <br />WDFW and Permit Coordination <br />12 <br />4 <br />$2W <br />4.80 <br />Hydraulic Investigation Report <br />20 <br />4 <br />16 <br />$6.572 <br />4.90 <br />Meetings & Administration <br />10 <br />3 <br />2 <br />$2-612 <br />4.100 <br />Feasibility Review for 60' span bridge <br />4 <br />8 <br />1 <br />$1.726 <br />4.101 <br />Review of temporary bridge details for 1 year <br />In service <br />4 <br />4 <br />$1,241 <br />optio <br />nal <br />Labor Subtotal: <br />— -- <br />Ja�Qalkhr--* <br />76 <br />a <br />95 <br />s <br />$26,665 <br />$218 <br />5 <br />ENVIRONMENTAL DOCUMENTATION & <br />PERMITTING <br />Labor Subtotal: <br />�Ut:no%rte <br />0 <br />0 <br />— <br />0 <br />-- <br />0 <br />$0 <br />5 <br />CIVIL ENGINEERING <br />Labor Subtotal: <br />_Lau orGiirri: <br />Reimbursable Sum: <br />0 <br />ro <br />0 <br />3 <br />0 <br />95 <br />0 <br />3 <br />$0 <br />$218 <br />Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.