Laserfiche WebLink
June 6, 2019 <br />Watershed Science & Engineering <br />WSE <br />BIG BOULDER CREEK BRIDGE <br />REPLACEMENT <br />Principal <br />Senior <br />Engineer 1 <br />.Junior <br />Engineer <br />Contract <br />Administrator <br />Nem <br />SCOPE OF WORK <br />$212.99 <br />$189.66 <br />$97.37 <br />$94.93 <br />1 <br />PROJECT MANAGEMENT <br />Labor Subtotal: <br />o <br />0 <br />0 <br />0 <br />$0 <br />2 <br />STRUCTURAL ENGINEERING <br />Labor Subtotal: <br />0 <br />0 <br />0 <br />0 <br />$o <br />GEOTECHNICAL ENGINEERING <br />4 <br />Labor Subtotal: <br />n 1��51L�EfL`•Le <br />HYDRAULIC ENGINEERING <br />0 <br />0 <br />0 <br />_ <br />0 <br />$o <br />4.10 <br />Data Collection and Review <br />2 <br />8 <br />$1,245 <br />4.20 <br />Site Inspection <br />8 <br />8 <br />$2483 <br />4.30 <br />Channel Survey <br />2 <br />4 <br />$815 <br />4.40 <br />Hydrology <br />2 <br />4 <br />$815 <br />4.50 <br />Hydraulic Analysis <br />2 <br />1 <br />20 <br />$2:562 <br />4.60 <br />Channel Stability and Scour Assessment <br />10 <br />16 <br />$3.688 <br />4.70 <br />WDFW and Permit Coordination <br />12 <br />4 <br />$2W <br />4.80 <br />Hydraulic Investigation Report <br />20 <br />4 <br />16 <br />$6.572 <br />4.90 <br />Meetings & Administration <br />10 <br />3 <br />2 <br />$2-612 <br />4.100 <br />Feasibility Review for 60' span bridge <br />4 <br />8 <br />1 <br />$1.726 <br />4.101 <br />Review of temporary bridge details for 1 year <br />In service <br />4 <br />4 <br />$1,241 <br />optio <br />nal <br />Labor Subtotal: <br />— -- <br />Ja�Qalkhr--* <br />76 <br />a <br />95 <br />s <br />$26,665 <br />$218 <br />5 <br />ENVIRONMENTAL DOCUMENTATION & <br />PERMITTING <br />Labor Subtotal: <br />�Ut:no%rte <br />0 <br />0 <br />— <br />0 <br />-- <br />0 <br />$0 <br />5 <br />CIVIL ENGINEERING <br />Labor Subtotal: <br />_Lau orGiirri: <br />Reimbursable Sum: <br />0 <br />ro <br />0 <br />3 <br />0 <br />95 <br />0 <br />3 <br />$0 <br />$218 <br />Page 3 of 4 <br />