My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-06-10-minutes-public-works-study-session
>
Meetings
>
2019
>
06. June
>
2019-06-18 10:00 AM - Commissioners' Agenda
>
2019-06-10-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 12:40:47 PM
Creation date
5/12/2020 12:36:06 PM
Metadata
Fields
Template:
Meeting
Date
6/18/2019
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
54424
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
June 6, 2019 <br />KPFF Consulting Engineers <br />KPFF <br />BIG BOULDER CREEK BRIDGE <br />REPLACEMENT <br />Principal Project <br />Manager <br />Technical Structural Project <br />Specialist Task Lead Engineer <br />CAD <br />Technician <br />Project <br />Coordinator <br />Hem <br />I SCOPE OF WORK <br />$171.62 $119.66 <br />$171.52 <br />$119.68 <br />$114,34 <br />$121.66 <br />$76.24 <br />1 <br />PROJECT MANAGEMENT <br />1.10 <br />Project Team Management and Coordination <br />60 <br />$7"181 <br />1.20 <br />Monthly Progress ReportsAnvoices <br />8 <br />12 <br />$1,872 <br />1.30 <br />Monthly Project Progress Meetings/Minutes <br />ifi <br />6 <br />$2.372 <br />1.40 <br />Coordination with WDFW <br />a <br />$957 <br />$957 - <br />1.60 1 eam Coordination fcr design change 8 <br />Labor Subtotal: 100 <br />18 <br />$12,383 <br />$119.90 <br />-- <br />j •�� <br />$15,673.00 <br />2 <br />_1r, <br />STRUCTURAL ENGINEERING <br />2.10 <br />Project Kickoff Meeting and Site Visit <br />6 <br />6 <br />$1436 <br />2.20 <br />Alternative Analysis Memo <br />2 <br />16 <br />$2.258 <br />2.30 <br />Development of PS&E/Contract Bid <br />Documents <br />2.31 <br />Plan and Calculation Preparation <br />Cover Sheet <br />2 <br />2 <br />6 <br />$1,198 <br />General Notes, Quantities, <br />2 <br />4 <br />4 <br />20 <br />_ $3712--- <br />3712Bridge <br />BridgeLayout - plan and elevation <br />4 <br />20 <br />8 <br />20 <br />36,428 <br />Foundation Plan - Layout <br />2 <br />4 <br />16 <br />20 <br />_ <br />$5:084_ <br />Footing Details <br />2 <br />4 <br />16 <br />20 <br />$5084 <br />Wingwall Layout / Details <br />2 <br />4 <br />16 <br />20 <br />$5,084 <br />Temporary/Detour Bridge Layout <br />2 <br />4 <br />16 <br />20 <br />S5 084 <br />2.32 <br />Structural Special Provisions <br />4 <br />16 <br />8 <br />$36116 <br />2.33 <br />Cost Estimate <br />2 <br />4 <br />8 <br />_ $1 736 <br />2.34 <br />Deliverable Preparation (30%, 75%, 100%2 <br />hr. each) <br />6 <br />6 <br />6 <br />2 <br />$2287 <br />2.40 <br />Quality Control Checks and Reviews <br />8 6 <br />6 <br />20 <br />4 <br />4 <br />_ <br />56 457_ <br />2.50 <br />Technical Collaboration (Survey, Civil, <br />Geotechnical, Hydraulics, Environmental) <br />6 <br />16 <br />8 <br />a <br />$4832 - <br />2.60 <br />Construction Support (RFI's, Submittals, etc.) <br />as needed <br />a <br />g <br />$1872 <br />2.70 <br />Feasibility Review for B0' span bridge <br />8 <br />2 <br />_ <br />$1 18B <br />2.71 <br />Review of temporary bridge details for 1 year <br />in service <br />4 <br />2 <br />$707 <br />2.80 <br />Revise contract documents to remove <br />permanent brid a work <br />2 2 <br />8 <br />2 <br />8 <br />$2,742 <br />Labor Subtotal: <br />10 14 <br />34 184 <br />1za <br />152 <br />z <br />$60,705 <br />$0.00 <br />GEOTECHNICAL ENGINEERING <br />0 <br />Labor Subtotal: <br />.. <br />0 0 <br />0 <br />0 <br />0 <br />- <br />0 <br />0 <br />I <br />$9 <br />$0.00 <br />4 <br />HYDRAULIC ENGINEERING <br />6 <br />Labor Subtotal: <br />ENVIRONMENTAL DOCUMENTATION & <br />PERMITTING <br />0 0 <br />7-T-7-6 <br />0 <br />$0.00 <br />Labor Subtotal: <br />- <br />0 0 <br />0 <br />0 <br />0 <br />0 <br />- <br />0 <br />$0 <br />$0.00 <br />6 <br />CIVIL ENGINEERING <br />6.10 <br />Project Management <br />2 <br />4 <br />$2752 <br />6.20 <br />PS&E Bid Docs <br />Site Preparation Plan (9011001100 Ad) <br />2 <br />14 <br />- $4,079 <br />Roadway plan and profile (301901100/100 Ad) <br />2 <br />20 <br />$5.590 <br />Typical Sections and Details (9011001100 Ad) <br />2 <br />12 <br />S3.250 <br />Detour plan, profile & typical section <br />(30/901100/100 Ad) <br />4 <br />24 <br />$6 500 <br />Full closure signage plan <br />2 <br />12 <br />$3,250 <br />Civil Stream grading for bypass and/or <br />�rlents (n0 drawings) <br />2 <br />$2 671 <br />Page 1 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.