Laserfiche WebLink
Exhibit E-1 <br />Jacobs Engineering <br />Consultant Fee Summary <br />Negotiated Hourly Rate Consultant Agreement <br />BIG BOULDER CREEK BRIDGE REPLACEMENT <br />Overhead (OH) Cost <br />117.00% <br />Fixed Fee (FF) <br />28.00% <br />Classification <br />Direct Hourly <br />Total <br />X <br />Negotiated <br />Cost <br />Rate <br />Hours <br />Hourly Rate <br />Env. Group Lead <br />$ 66.15 <br />54.00 <br />X <br />$162.07 <br />= $ <br />8,751.65 <br />Env. Project Manager <br />$ 47.83 <br />66.00 <br />X <br />$117.18 <br />= $ <br />7,734.11 <br />Permit Lead <br />$ 33.80 <br />100.00 <br />X <br />$82.81 <br />= $ <br />8,281.00 <br />Sr. Cultural <br />$ 76.13 <br />2.00 <br />X <br />$186.52 <br />= $ <br />373.04 <br />Cultural Field Tech <br />$ 28.00 <br />50.00 <br />X <br />$68.60 <br />= $ <br />3,430.00 <br />Env. Engineer Jr <br />$ 33.63 <br />30.00 <br />X <br />$82.39 <br />= $ <br />2,471.81 <br />Biologist <br />$ 33.80 <br />181.00 <br />X <br />$82.81 <br />= $ <br />14,988.61 <br />Technical Editor <br />$ 45.55 <br />9.00 <br />X <br />$111.60 <br />= $ <br />1,004.38 <br />Admin <br />$ 25.00 <br />4.00 <br />X <br />$61.25 <br />= $ <br />245.00 <br />Subtotal <br />$ <br />47,279.59 <br />Reimbursables <br />Mileage <br />(500 Miles x $0.5451mile) <br />$ <br />272.50 <br />Airfare <br />(Allowance) <br />$ <br />- <br />Per Diem <br />(Hotel + Meals @ $144/day x 3days) <br />$ <br />432.00 <br />Subcontract <br />(Sub Name & Task) <br />$ <br />- <br />(Blank) <br />(Allowance) <br />$ <br />- <br />Subtotal <br />$ <br />704.50 <br />GRAND TOTAL: $47,984.09 <br />