Laserfiche WebLink
1����poe5...'rp Ilrfcpl <br />KITTITA3 COUNTY <br />KZTTZTAIR CO <br />DEPARTMENT OF PUBLIC WORKS <br />• Attend six (6) progress meetings via teleconference. <br />• Prepare invoice progress reports <br />TASK 6.2 — Development of PS&ElContract Bid Documents <br />Plan Preparation for 30% 75%, 100% draft, 100%,4d <br />• Site Preparation <br />• Roadway plan and profile <br />• Typical sections and details <br />• Detour plan, profile and typical section <br />• Full Closure Signage Plan <br />Supporting Work. <br />• Civil stream grading for stream bypass. <br />• Prepare Stormwater Site plan and Construction Stormwater Pollution Prevention <br />Civil Special Provisions <br />• Provide WSDOT run list format civil technical special provisions <br />Civil Cost Estimate <br />• Provide quantities and unit prices for civil elements of work <br />TASK 6.3 — Quality Control Checks and Reviews <br />KPFF senior civil engineering staff will QC all civil design deliverables. <br />TASK 6.40 — Construction Support <br />If needed to provide support during construction to respond to RFI's and review submittals. <br />TASK 6.50 — Revise Contract Documents <br />Update plans, specifications and estimate and issue an addendum to the contract bid <br />documents as necessary to limit 2019 construction work to installation of temporary detour <br />road and bridge. <br />Assumptions: <br /># Existing ROW and survey basemap control provided by County will be depicted on civil <br />drawings. Temporary Construction Easement (TCE) limits will be defined on Civil Site <br />