My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-06-10-minutes-public-works-study-session
>
Meetings
>
2019
>
06. June
>
2019-06-18 10:00 AM - Commissioners' Agenda
>
2019-06-10-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 12:40:47 PM
Creation date
5/12/2020 12:36:06 PM
Metadata
Fields
Template:
Meeting
Date
6/18/2019
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
54424
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�CP.�pnEs ... 7p QFC <br />DEPARTMENT OF PUBLIC WORKS <br />Kul UTAS COUN'T'Y <br />a. Coordinate with Kittitas County CDS on SEPA, Shorelines, and Critical Areas <br />requirements. <br />TASK 5.50 — Biology Support During Construction <br />1. Support services during construction, including worksite isolation support, fish salvage <br />and removal, planting or site stabilization guidance up to 40 hours. This task is not <br />subject to Assumption Ia. <br />TASK 5.90 — Permit Update <br />Submit updated permits to reflect revised bridge span. Update permits to allow single <br />creek crossing for equipment to install temporary bridge and detour roadway. <br />Assumptions: <br />Coordination with FHWA or WSDOT Local Programs will not be required. <br />• The Biological Assessment that will be prepared will be "Likely to Adversely Affect" for <br />Bull Trout and Steelhead, and will require formal consultation with both USFWS and <br />NMF S. <br />• The US Army Corps of Engineers will issue a CWA Section 404 NWP 14. No individual <br />permit will be required. <br />• Section 106 will be determined as "May Affect", and will require SHPO concurrence <br />• The Department of Ecology will issue a Letter of Verification for CWA Section 402. No <br />individual permit will be required. <br />• No wetlands will be impacted by the project. This Scope does not include wetland <br />delineations or reporting. <br />• No NPDES Permit will be required. <br />• SEPA will be exempt. <br />• if the level of effort and cost for permit or approval acquisition is higher than the budget <br />amount, Jacobs will coordinate with KPFF and the County to determine amendments as <br />needed. <br />• No mitigation planning is included in this scope of work. <br />TASK 6 CIVIL/ROADWAY ENGINEERING <br />KPFF will provide civil engineering support for the replacement of Big Boulder Creek Bridge. <br />Civil design criteria will be Kittitas County Code Chapter 12- Roads and Bridge Standards and <br />as supplemented by the WSDOT Design Manual or AASHTO's Policy on Geometric Design of <br />Highway and Streets. <br />TASK 6.1— Civil Project Management <br />
The URL can be used to link to this page
Your browser does not support the video tag.