Laserfiche WebLink
UES 7_0 <br />a <br />._ . -3 <br />IUMTAS COUNTY <br />KZTTZTAB CO <br />DEPARTMENT OF PUBLIC WORKS <br />WSE will use USGS regional regression equations to estimate annual instantaneous peak design <br />flow rates. The design event for flow and scour will be the 100 -year flood and the check flood <br />for potential damage will be the 500 -year event. The 500 -year event is not the design event, it is <br />solely used to assess risk in -order to identify any remaining significant erosion or scour issues <br />that might need to be addressed in the design. <br />Assumptions: <br />USGS regression equations will provide reasonable estimates for the 100 -year and 500 - <br />year annual instantaneous peak flows. If they do not, WSE will use alternative methods <br />to estimate the flows. <br />TASK 4.50 — Hydraulic Analysis <br />WSE will develop a simple HEC -RAS model of Big Boulder Creek in the vicinity of the bridge <br />crossing using topographic base map. The model will not be calibrated because observed <br />dischargelhighwater marks are not available. Instead, WSE will use engineering judgment to <br />select and adjust model parameters. The model will be used to help size the bridge waterway, to <br />provide data required to evaluate lateral erosion and scour potential, and to develop <br />countermeasures. <br />TASK 4.60 — Channel Stability and Scour Assessment <br />WSE will determine if lateral erosion, local scour, ice, or debris flows pose a threat to the <br />proposed crossing. If they do, WSE will work with KPFF to address these hazards in the design. <br />Assumptions: <br />• These hazards will be addressed through modifications the structure itself (e.g. deeper <br />foundations, longer bridge, etc.) and not through design and installation of external <br />countermeasures (e.g. riprap). If countermeasures are required, the optional task at the <br />end of this scope will be completed. <br />TASK 4.70 — WDFW and Permit Coordination <br />It is anticipated that WDFW personnel have an idea of the length of crossing they would like to <br />see at the site. WSE will work with WDFW personnel, the County, and Jacobs (the company <br />that will acquire the project permits) to collectively arrive at a bridge length that is acceptable to <br />all parties. An allowance is provided for WSE's lead engineer to participate in one meeting with <br />WDFW personnel in Ellensburg. <br />Assumptions: <br />• A reasonable bridge length will be agreed to that the County can afford to build. <br />