Laserfiche WebLink
�gCAD ..s . — TO nig <br />IOT7IT.4S COUNTYf <br />3K31TTIT2Lfi6 COUN'T`Y <br />DEPARTMENT OF PUBLIC WORKS <br />TASK 2.32 — Structural Special Provisions <br />TASK 2.33 — Cost Estimate <br />TASK 2.34 — Deliverable preparation <br />TASK 2.40 — Quality Control Checks and Reviews <br />TASK 2.50 — Technical Collaboration <br />Structural design engineers will coordinate with survey, civil, geotechnical, hydraulics and <br />environmental engineers for project design and contract coordination. <br />TASK 2.60 — Construction Support <br />If needed to provide support during construction to respond to RFI's and review submittals. <br />TASK 2.70 — FeasibiIity Review <br />Perform a high level review to determine if a 60 foot bridge span is feasible to eliminate <br />need for cast -in-place concrete abutments. Evaluate existing design for using temporary <br />detour bridge for 1 year rather than originally anticipated 3 month duration. <br />TASK 2.80 — Revise Contract Documents <br />Update plans, specifications and estimate and issue and addendum to the contract bid <br />documents as necessary to limit 2019 construction work to installation of temporary detour <br />road and bridge. <br />TASK 3 GEOTECHNICAL ENGINEERING <br />TASK 3.10 — Planning and Research <br />Hart Crowser will review readily available geologic maps and water well logs that cover the site <br />vicinity, and other reports and plans provided by others (if any) for general information <br />regarding subsurface soil and groundwater conditions and geologic hazards. <br />Hart Crowser will coordinate field explorations with KPFF, Kittitas County, USFS, drilling <br />subcontractors, and internal staff. If required, Hart Crowser will submit a traffic control plan for <br />review by the County. <br />