My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-06-10-minutes-public-works-study-session
>
Meetings
>
2019
>
06. June
>
2019-06-18 10:00 AM - Commissioners' Agenda
>
2019-06-10-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 12:40:47 PM
Creation date
5/12/2020 12:36:06 PM
Metadata
Fields
Template:
Meeting
Date
6/18/2019
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
54424
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
noEs , To rNa <br />KZTTZTAB CO <br />DEPARTMENT OF PUBLIC WORKS <br />IQTrrrAS COUNTY <br />compliance assurance, file and staff organization, client communications (emails and telephone), <br />and general project oversight. Project Management tasks include: <br />1.1 Project Team Management and Coordination <br />1.2 Monthly Progress Reports/Invoices (Assume 8) <br />1.3 Monthly Project Progress Meetings/Minutes (Assume 8 meetings, held via <br />teleconference) <br />1.4 Coordination with WDFW (Assume 8 hours) <br />1.5 Management Reserve - allocation of the reserve funds for additional out of scope <br />tasks based on written approval of the County <br />1.6 Project team coordination for addendum & design change <br />TASK 2 STRUCTURAL ENGINEERING <br />KPFF shall perform the structural engineering analysis and design of the Big Boulder Creek <br />Bridge substructure. KPFF shall perform appropriate analysis and design calculations in <br />accordance with the most current edition (at the time of NTP) of the WSDOT Bridge Design <br />Manual (BDM) and the AASHTO LRFD Bridge Design Specifications, and the Local Agency <br />Guidelines. Considering the location and use of the bridge, alternative criteria, such as Forest <br />Service guidelines, may be considered to reduce construction costs. <br />TASK 2.1— Project Kickoff Meeting and Site Visit <br />A project kickoff meeting will be held at the existing bridge site. <br />TASK 2.2 — Alternative Analysis Memo <br />Brief memo to summarize site constraints, design criteria and preferred bridge structure <br />TASK 2.3 — Development of PS&E/Contract Bid Documents <br />TASK 2.31— Plan and Calculation Preparation <br />• Project Cover Sheet <br />• General Notes and Quantities <br />• Bridge Layout - plan and elevation <br />• Structural notes <br />• Foundation Plan — Layout <br />• Foundation Design and Details <br />• Wingwall Layout/Details <br />
The URL can be used to link to this page
Your browser does not support the video tag.