My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-06-11-minutes-solid-waste-and-maintenance
>
Meetings
>
2019
>
07. July
>
2019-07-16 10:00 AM - Commissioners' Agenda
>
2019-06-11-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 12:12:44 PM
Creation date
5/12/2020 12:12:25 PM
Metadata
Fields
Template:
Meeting
Date
7/16/2019
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
55168
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PHASE5-SCOPEOFWORKTask7:TraicImpactAnalysisJacobswillprovideadditionaltrafficengineeringservicestoincludetheproposedmaintenancefacilityandroll-offstorageareatrafficvehicles.JacobswillperformoneadditionalonsitequeuinganalysisandevaluateadditionalcityofEllensburgrequestedintersectionsassummarizedbelow:1.US97andFutureComprehensivePlanStreet2.US97/NorthDolarwayRd/WestUniversityWay3.WestUniversityWayandReecerCreekRd4.NorthRailroadAveandW5*AveJacobswillperformadditionaltrafficcountsattwo(2)additionalintersectionsthathavenotalreadybeencounted.JacobsassumesthatthePWDwillprovidetrafficcountsattheexistingmaintenancefacility.TheexistingdraftTIAwillberevisedtoincludetheadditionalanalysis.ReviseddraftcopyofthetechnicalmemorandumwillbesubmittedtotheCountyforreviewandcomments.ThefinaltechnicalmemorandumwillincorporatecommentsreceivedasappropriateandwillbeusedforintheapplicationfortheCity'ssiteplanapproval.Assumptions•Synchrotrafficmodelwillbeusedtoevaluatetrafficoperations(delay/LOS)attheproposedsiteaccessdriveway(s)andSidratrafficmodelwillbeusedtoevaluateRoundaboutoperationsatWUniversityWay/US97/NDolarwayRoad.VISSIMmicrosimulationtool(2D)willbeusedtoassessqueuingimpactswithinthesiteanddetermineifthequeuesspillbackontoUS97withtheproposedfacility.•TrafficcountswillbeperformedbyJacobsattwo(4)additionalintersectionsforadurationof(2)hoursperintersection.•PWDprovidesJacobswithtrafficcountsfortheexistingmaintenancefacility•CityofEllensburgwillallowsubmittaloftheTIAaftersubmittaloftheSEPAChecklistDeliverables:•ReviseddraftandfinalTrafficImpactAnalysisTechnicalMemorandumTask8:SEPAUpdateJacobswillupdatetheStateEnvironmentalPolicyAct(SEPA)EnvironmentalChecklisttoincludethePWDmaintenancefacilityandroll-offstorageyard.ThechangetothedrivewayconfigurationandincreasedtrafficwillrequiresignificantrevisiontotheSEPAChecklistSectionB,EnvironmentalElements,Subsection7(Noise)andSubsection14(Transportation)basedontheTIApreparedunderTask7.Assumption•Onlyone(1)SEPAEnvironmentalchecklistwillbeneededforallsitingandfacilitypermitting.•AnEnvironmentalImpactStatement(EIS)willnotberequiredDeliverables:•DraftandFinalSEPAEnvironmentalchecklist3
The URL can be used to link to this page
Your browser does not support the video tag.