My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-08-12-minutes-public-works-study-session
>
Meetings
>
2019
>
08. August
>
2019-08-20 10:00 AM - Commissioners' Agenda
>
2019-08-12-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 11:09:18 AM
Creation date
5/12/2020 11:08:52 AM
Metadata
Fields
Template:
Meeting
Date
8/20/2019
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
55882
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOARD OF COUNTY COMMISSIONERS <br />COUNTY OF KITTITAS <br />STATE OF WASHINGTON <br />RESOLUTION NO. 2019 - <br />AWARDING THE DESIGN AND ENVIRONMENTAL PERMITTING FOR THE <br />NANEUM ROAD CULVERT REPLACEMENT PROJECT TO JACOBS AND <br />AUTHORIZE THE PUBLIC WORKS DIRECTOR TO NEGOTIATE SCOPE OF WORK <br />AND FEE FOR SAID PROJECT <br />WHEREAS: Public Works solicited for qualified design and engineering firms pursuant to <br />state and federal procurement regulations; and <br />WHEREAS: Eight (8) qualified engineering firms responded to the request for qualifications <br />with process closing on June 27, 2019; and <br />WHEREAS: A review committee of Public Works staff evaluated responses and reviewers <br />have selected Jacobs as the preferred firm to provide said services; and <br />NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the <br />best interest of the public, does hereby authorize the Public Works Director to negotiate a scope <br />of work and fee with Jacobs for the design and environmental permitting for the Naneum Road <br />Culvert Replacement Project and authorizes the signature of the Public Works Director on the <br />required local agency agreement providing an acceptable scope of work and fee is successfully <br />negotiated. <br />DATED this 12th day of August, 2019, at Ellensburg, Washington. <br />BOARD OF COUNTY COMMISSIONERS <br />KITTITAS COUNTY, WASHINGTON <br />Cory Wright, Chairman <br />Attest: <br />❑ Clerk of the Board- Julie Kjorsvik <br />Brett Wachsmith, Vice -Chairman <br />❑ Deputy Clerk of the Board- Mandy Buchholz <br />Laura Osiadacz, Commissioner <br />
The URL can be used to link to this page
Your browser does not support the video tag.