Laserfiche WebLink
October 25, 2019 <br />Jacobs Engnevdng <br />JE <br />BIG BOULDER CREEK BRIDGE <br />REPLACEMENT <br />any. GroupP <br />Lead Mare a jw <br />Permx sr. °Flee <br />Lead Cu6urel Tech <br />�� alababt Tachemd Amin <br />Jr FAIbr <br />Item SCOPB OFWORK <br />$1b207 <br />$117.18 $82.81 111156.1521 $88.80 1 <br />882.99 <br />1 $84.87 $117.80 126 <br />6 CIVIL ENGINEERING <br />6.10 Project Management <br />6.20 PSAE Bid DWA <br />Site Prep radon Pian {80!1001100 Ad) <br />Roadway plan and profile (30610!1001100 Ad) <br />Typical Sacdons and Dafaiis (9011001100 Ad) <br />Detour plan, profile & Weal section <br />9001700 Ad <br />FVI closure sWnage plan <br />CYII Stream grading for bypass andlor <br />abutments no drewi <br />Stomnvater Site plan and CSPP <br />_ <br />Civil Special Provlslorre <br />civil Cast Estimate <br />6.30 QC Reviews <br />6.40 Construction Support <br />6.90 Revise wntrect documerda to remove <br />permanent brill ewodr <br />6.60 Revise contract documents for 600 Span I <br />Labor Subtotal_ <br />d*Fsm: <br />F�1rn Wie Stan' <br />d <br />M <br />g <br />a <br />p 0 0 <br />901E _ � id <br />0 <br />.39 <br />C 0 0 <br />1 a d <br />$0 <br />H7— <br />5705 v <br />1 FU Page 8 of 8 <br />