My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-11-12-minutes-public-works-study-session
>
Meetings
>
2019
>
11. November
>
2019-11-19 10:00 AM - Commissioners' Agenda
>
2019-11-12-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 10:47:12 AM
Creation date
5/12/2020 10:44:08 AM
Metadata
Fields
Template:
Meeting
Date
11/19/2019
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
57953
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
October 25, 2018 <br />Jacobs Engineering <br />JE <br />BIG BOULDER CREEK BRIDGE <br />REPLACEMENT <br />Era. G vup <br />Lead <br />�L pone, Sr. Sr. Cult a I Engines E.Blot Id Technical Main <br />Mom load Cultural Rod °g Edmr <br />Techhorn <br />SCOPEOFWORK <br />$162.07 <br />$117.18 IS02.81 $188.52 $86.80 $82.89 $62.81 $111.60 $6126 <br />1 PROJECT MANAGEMENT <br />1.10 "ect 7aam Management arld Coordination <br />1.20 Monthly Progress Reporlal!rnoices <br />1.30 Monthly Project Progress MeetingslMiraEes <br />1.40 Coordination with WDFW <br />1.60 Team Coordinatlon for des!gn change <br />7.70 Teem Coordinatlon for revised dealon <br />Labor Subtotal: <br />row <br />2 STRUCTURAL ENGINEERING <br />0 1 <br />0 <br />0 0 0 0 0 0 0 <br />6g <br />210 Pro act FOrdaofll Meati and Slle 'Ash <br />2.20 Altema6ve Anay6!s Memo <br />230 Davatepmerd of PB$EfCordracl Bid <br />Documents <br />2.31 Plan and Caln:latlon Preparation <br />Cover Sheet <br />Genera! Notes, Quantities, <br />Bridge Le oul - Man and alevalton <br />_ <br />Foundation Plan - Layout <br />Fooling DrtaGs <br />WingvMl Layout! Details <br />Temporary/Detour Bridge u! <br />2.32 Struot ral Special Provisions <br />2.33 Cost Estlmats <br />234 Deliverable Preparation (30q, 75%,11)0%2 <br />hr. each <br />I <br />240 Quality Control Checks and Revlon <br />2 60 Techr9cal Callaboralion (Survey, Civil, <br />Geotechriwl Hnanl!cs E Imnmenta <br />2 :uchon upport s, m r, a c. <br />a needed <br />- <br />2.70 Fesafblilty Rawl" for W Van bridge <br />2.71 Revlew of temporary bridge deta8s for 1 year <br />In 9ONICe <br />280 Bevies contract tlacumenta m ""weanentbraid = <br />Labor Subtotal: <br />GEOTECHNICAL ENGINEERING <br />0 <br />0 <br />1 0 0 1 0 1 a o a 0 <br />50 <br />3.10 Planning and Research <br />3.20 Ffeld Wank <br />3.21 Site Recennsissarrce and Utility Locates <br />3.22 F!e;d Explorat!ons <br />_ <br />9.29 Sample Review A Laboratory Testing <br />3.30 Office Work <br />W <br />3.31 Engirseming Araiyais and Consulle8ons <br />332 Geotechnical Reporting <br />133 P. 'ect Management and Meetings <br />34D Canatrmctlon Su ort <br />3.60 Feasidlfty Review Por w Span bridge <br />LL. <br />9.61 Review of temporary bridge details for 1 year <br />in swvlcs <br />Revlae Geote"hndcal Recummenclarkm for <br />3.02BOBS an <br />Labor BYbtatel: <br />4 thORAULiC FWGIa1GGIVHti <br />0 <br />0 <br />0 4 1 0 1 0 <br />$0 <br />A10 jData Cdieodon and Revirw <br />4.20 S'te Inspection <br />430 Channel Survey <br />4.40 Flydrolog <br />4.50 Hydraulic Analysis <br />4.60 Channel Stability and Scour Aaeesareem <br />4.70 WDFW and Permit Caordlnatian <br />4.80 Hydraullo Investigation Report <br />4.00 Meetings AAdminist <br />4. Too Feasibility Rerlesrllor 60'spon bridge <br />4.101 Pa iew of temporary bridge details for 1 year <br />In service <br />Qptlo <br />nal <br />Labor Subtotal: <br />S ENVIRONMENTAL DOCUMENTATION i <br />PERMITTING <br />0 1 <br />D <br />I 0 0 <br />5.10 Project Managemenl <br />2 <br />14 <br />4 <br />$2210 <br />120 Agency Coordination <br />3 <br />5 <br />$1,072 <br />130 NEPAISEPA Dacumenlation <br />1 <br />5 <br />30 <br />_ <br />$9282 <br />140 Biological Assessment <br />40 <br />20 <br />06 5 <br />$17,9x4 <br />150 NHPA Section 106 Evaluation <br />1 <br />4 <br />2 50 2 <br />$4,�T <br />100 JARPA Package Preparation and Submittal <br />I <br />5 <br />40 10 5 2 <br />y6,a22- <br />170 Local Pamits and Approvals <br />1 <br />3 <br />A <br />$1,858 <br />180 B!ology Support During Constuc!!un <br />O Borrel <br />2 <br />4 <br />$$3,547 <br />5.80 Permit Update - 60' Bdd <br />5 <br />8 <br />14 20 40 <br />$7,$57 <br />. _ .... � Labor Subtotal: <br />54 <br />� .. <br />a8 <br />Igo 1 60 80 761 ! 4 <br />1147,28a <br />kPff Pegs 7 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.