My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-11-12-minutes-public-works-study-session
>
Meetings
>
2019
>
11. November
>
2019-11-19 10:00 AM - Commissioners' Agenda
>
2019-11-12-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 10:47:12 AM
Creation date
5/12/2020 10:44:08 AM
Metadata
Fields
Template:
Meeting
Date
11/19/2019
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
57953
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KITTITAS COUNTY <br />DEPARTMENT OF PUBLIC WORKS <br />STUDY SESSION STAFF REPORT <br />STUDY SESSION DATE: November 12, 2019 <br />ACTION REQUESTED: Request to approve a Resolution Authorizing Chair <br />Signature on KPFF Task Order No. 16, Supplement <br />No. 3 - Big Boulder Creek Bridge Replacement <br />BACKGROUND: Responding to a Forest Service load restriction to the Big <br />Boulder Creek Bridge in 2018, Public Works engaged <br />KPFF for a bridge replacement design (Resolution 2018- <br />160 for $173,000). The resignation of the Engineering <br />Services Manager necessitated an additional $35,000 in <br />engineering costs with Supplement No. 1. The lack of <br />project bidders forced Public Works to reduce the bridge <br />replacement design to setting a temporary bridge only with <br />Supplement No. 2. The total cost for design services is <br />now $228,000. <br />Public Works has negotiated a final supplement in the <br />amount of $20,000 to produce a revised final design that <br />targets the placement of a 60 foot bridge on precast <br />foundations. Sub -consultants Watershed Science and <br />Engineering and Jacobs are not requesting additional <br />compensation for the redesign effort. Sub -consultants Hart <br />Crowser (Geotechnical) and KPFF civil division are <br />seeking compensation with a minimal amount from KPFF <br />Bridge Division. <br />INTERACTION: Public Works <br />RECOMMENDATION: Approve the Resolution authorizing the Chair's signature <br />on KPFF Task Order No, 16, Supplement No. 3 for Big <br />Boulder Creek Bridge Replacement. <br />HANDLING: Return one original to Public Works <br />ATTACHMENTS: Resolution, Task Order No. 16, Supplement No. 3 with <br />KPFF <br />LEAD STAFF: Mark R. Cook, Director <br />
The URL can be used to link to this page
Your browser does not support the video tag.