My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-11-12-minutes-public-works-study-session
>
Meetings
>
2019
>
11. November
>
2019-11-19 10:00 AM - Commissioners' Agenda
>
2019-11-12-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 10:47:12 AM
Creation date
5/12/2020 10:44:08 AM
Metadata
Fields
Template:
Meeting
Date
11/19/2019
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
57953
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT TITLE: <br />BOWERS FIELD AIRPORT - RUNWAY 7-25 REHABILITATION <br />CLIENT: <br />KITTITAS COUNTY <br />JOB NUMBER: <br />EXHIBIT B <br />PRINCIPAL <br />SR PROD <br />PRO= <br />SR. PROD <br />PROJ <br />CADD <br />VPIENOR <br />MOR <br />PM ENGR ENGR <br />ENGR <br />DSGN <br />CLER. <br />TOTAL PROJECT' <br />TASK <br />PROIECTTASK <br />3217.00 <br />5200.00 <br />$151.00 <br />$125.00 <br />5113.00 <br />$85.00 <br />577.00 <br />HRS <br />COST <br />COST <br />DESIGN & BIDDING SERVICES <br />TASK f -Project ManagementlAdministrAtion <br />$15,228.00 <br />I Project Administration (4 mm& period) <br />0 <br />12 <br />2 <br />2 <br />0 <br />0 <br />12 <br />28 <br />$3,876.00 <br />2 On-site Field Coordinate Project Team (2 trips) <br />0 <br />1 <br />0 <br />16 <br />0 <br />0 <br />0 <br />17 <br />32,200.00 <br />3 Conduct in-house QA/QC <br />0 <br />12 <br />0 <br />0 <br />0 <br />0 <br />12 <br />$2,400.00 <br />4 Provide P:njectSchedule <br />0 <br />2 <br />2 <br />0 <br />it <br />0 <br />4 <br />5650.00 <br />5 Prepare FAA Farm 7460 & FAA Coordination <br />0 <br />2 <br />4 <br />0 <br />0 <br />0 <br />6 <br />$900.00 <br />6 Prepare FAA Form 748C & FAA Cocadmation <br />0 <br />10 <br />2 <br />16 <br />0 <br />11 <br />0 <br />28 <br />54,302.00 <br />7 Asessa Construction. Finding Design Standards <br />0 <br />2 <br />0 <br />0 <br />0 <br />0 <br />6 <br />$900.00 <br />TASK 2 -Design Survey &. Survey Base MAP Set Up <br />1.2 Supplemental Topographic Survey <br />KPG fee listed in euboonaultard section <br />TASK 3 -Geotechnical Investigation <br />1 Geotechnical Imvertigation <br />HWA fee listed <br />in subconsultard section <br />TASK 4- NEPA Review and Documentation <br />1 No, applicable I Not included <br />TASKS Electrical, Lighting, Signage, & NAVAIDS <br />1 Not applicable 1 Not included <br />TASK 6-90% Design <br />S36,7B7.00 <br />1 Survey Data Review & Plmr Set Base Map <br />0 <br />1 <br />0 <br />4 <br />0 <br />0 <br />0 <br />5 <br />$700.00 <br />2 Clear Approach Survey Data Review & Memo <br />0 <br />2 <br />0 <br />4 <br />0 <br />0 <br />0 <br />6 <br />5900.00 <br />3 Geotech Findiaga & Report Review <br />0 <br />2 <br />0 <br />4 <br />0 <br />0 <br />0 <br />6 <br />5900.00 <br />4 Pavement Transverse and Profile Grade Design <br />0 <br />0 <br />2 <br />20 <br />2 <br />0 <br />24 <br />S3,02&00 <br />5 Pavement Section Design <br />0 <br />2 <br />0 <br />to <br />10 <br />0 <br />22 <br />52,780.00 <br />6 Construction Safety & Phasing PlanalDocument <br />0 <br />4 <br />0 <br />10 <br />0 <br />0 <br />14 <br />$2,050.00 <br />7 Design Runway Pavemerd Markings <br />0 <br />1 <br />0 <br />2 <br />4 <br />0 <br />0 <br />7 <br />$902.00 <br />8 Nam -Illuminated Signage Adjustment Design <br />0 <br />1 <br />0 <br />4 <br />0 <br />0 <br />0 <br />5 <br />$700.00 <br />9 90% Plans (18 sheets) <br />0 <br />4 <br />12 <br />56 <br />0 <br />56 <br />0 <br />128 <br />$14,372.00 <br />10 90% Bidding Documents (Specifications) <br />0 <br />2 <br />16 <br />32 <br />0 <br />0 <br />8 <br />58 <br />$7,432.00 <br />11 90% Quantities and Cast Estimate <br />0 <br />1 <br />1 <br />4 <br />6 <br />0 <br />0 <br />12 <br />$1,529.00 <br />12 NPDES Away ment and NOI <br />0 <br />0 <br />1 <br />- <br />0 <br />0 <br />3 <br />S40L00 <br />13 Prepare Submitted Set <br />0 <br />0 <br />0 <br />- <br />0 <br />L <br />4 <br />7 <br />$643.00 <br />14 90% Review Meeting (Phare Conference) <br />0 <br />1 <br />0 <br />0 <br />0 <br />3 <br />3450.00 <br />TASK 7 -Final Design <br />513,320.00 <br />I Review and Address 90% commend <br />0 <br />2 <br />0 <br />4 <br />4 <br />0 <br />10 <br />51,352.00 <br />2 (Final Plans (18 sheets) <br />0 <br />2 <br />12 <br />24 <br />0 <br />24 <br />0 <br />62 <br />57,252.00 <br />3 Find Bidding Documents (Specifications) <br />0 <br />2 <br />4 <br />8 <br />0 <br />0 <br />8 <br />22 <br />$2,620.00 <br />4 Fnml Quantities and Coal Estimate <br />0 <br />1 <br />1 <br />2 <br />4 <br />0 <br />0 <br />8 <br />$1,053.00 <br />5 Prapars Final Sabmittal Set <br />0 <br />2 <br />0 <br />2 <br />0 <br />L <br />4 <br />9 <br />31,043.00 <br />Labor Subtotal <br />EXPENSES: <br />Travel: <br />Lodging <br />RentalC /Fm"ilsge <br />Airfare <br />Meals <br />]Misr. expenses: <br />MISC <br />PHOTO COPIES <br />POSTAGE <br />PRINTING <br />PLOTTING <br />FIELD SUPPLIES <br />Sub -Consultand: <br />Tcpograpidc Survey (LPG) <br />Geotechnical (FWA) <br />0 71 53 240 30 82 36 112 $65,335.00 565,335.00 <br />Cast Air Ground R.T. <br />Per Unit Trips Trips Days Niles Markup <br />$0.00 0 1.0 <br />$0.600 3 223 1.0 <br />$0.00 0 0 1.0 <br />$30.00 0 1.0 <br />LO <br />1.0 <br />$0.00 <br />$401 <br />So.00 <br />$0.00 <br />$100.00 <br />550.00 <br />$20.00 <br />$500.00 <br />3200.00 <br />$0.00 <br />56,802.00 <br />510,765.00 <br />Subtotal - Expenses 31,271.40 <br />Subtotal - Subconrultents 517,567.00 <br />Total - $84,173 <br />
The URL can be used to link to this page
Your browser does not support the video tag.