Laserfiche WebLink
GA,pDES... i"pCq' <br />Gkk <br />KZTTITA44 CO <br />DEPARTMENT OF PUBLIC WORKS <br />Assumptions: <br />• Existing ROW and survey basemap control provided by County will be depicted on civil <br />drawings. Temporary Construction Easement (TCE) limits will be defined on Civil Site <br />Preparation plan. Legal Descriptions of TCE's, including TCE documentation and <br />acquisition will be performed by the County. <br />• Temporary Erosion and Sediment Control (TESC) plans will not be provided, a <br />performance spec will be used for TESC. For Stormwater Management it is assumed the <br />project is considered Road Preservation per SWMMEW Section 2.1.4 and therefore only <br />needs to meet core requirement #1 and #2 as scoped above. Preparation of the <br />Construction SWPPP will be a bid item and prepared by the Contractor. <br />Approach guardrail systems will not be required. Bridge railings will be signed with <br />hazard object markers. <br />PROJECT DELIVERABLES: <br />1. Alternatives Analysis Memo (Draft and Final) <br />2. 30% Plan Set (Permit set. 3 sheets estimated. Layout, Elevation, Cross-section, <br />structural notes, Cost Estimate) <br />3. 75% Plan Set (6-8 sheets, updated cost estimate, GSP run -list, 30% comment <br />resolution) <br />4. 100% Draft Plans (6-8 sheets, updated cost estimate, PDF of GSP's or run -list and <br />PSE files, pending final review by county, 75% comment resolution and complete <br />PS&E) <br />5. 100% Stamped and Signed Plans (Contract Documents — bid ready) <br />6. Geotechnical report (Draft PDF and Final PDF + 3 hard copies) <br />7. One (1) NEPA CE and ECS Form <br />8. One (1) NBFA Section 106 Compliance Memo <br />9. One (1) Biological Assessment (Formal Consultation) <br />10. One (1) SEPA Checklist (Unless Exempt) <br />11. One (1) 7ARPA package for delivery to USACE, WDFW, and WDOE <br />12. Local Agency correspondence for each permit, approval, or exemption <br />PROJECT ASSUMPTIONS: <br />COUNTY to provide KPFF with the project survey base map. County will collect <br />additional data as necessary as requested by KPFF. Contours shall be in at least 2 <br />foot increments and shall preferably extend at least 200 feet to the north, south, east <br />and west of the proposed project limits to include all utilities, driveways, ditches, <br />