My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-11-12-minutes-public-works-study-session
>
Meetings
>
2019
>
11. November
>
2019-11-19 10:00 AM - Commissioners' Agenda
>
2019-11-12-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 10:47:12 AM
Creation date
5/12/2020 10:44:08 AM
Metadata
Fields
Template:
Meeting
Date
11/19/2019
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
57953
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�G DFA ... rn <br />IGMTAS COUNTY <br />KZTTITgS CO <br />DEPARTMENT OF PUBLIC WORKS <br />Hart Crowser will start analysis and reporting immediately upon receiving notice to <br />proceed (NTP). We estimate that the engineering analyses and draft geotechnical report <br />supplement should be completed approximately 3 weeks after NTP. However, Hart <br />Crowser will consult with the design team regularly to provide the results of our analyses <br />and recommendations. <br />TASK 4 HYDRAULIC DESIGN <br />Watershed Science & Engineering (WSE) will provide hydraulic engineering services for the Big <br />Boulder Creek Bridge Replacement Project in Kittitas County, Washington. WSE will lead the <br />hydraulic engineering portions of the project which will include completing the following tasks. <br />TASK 4.10 — Data Collection and Review <br />WSE will collect and review existing data and information needed to complete the hydraulic <br />investigation. Data will include but not be limited to topographic maps including LiDAR data, <br />historical aerial photos, flood data, bridge maintenance records, and anecdotal information on <br />past flood events from County maintenance staff. <br />Assumptions: <br />• County will supply relevant data they possess <br />TASK 4.20 — Site Inspection <br />WSE will conduct a one -day field inspection to examine the crossing and Big Boulder Creek. <br />WSE will examine hydraulic and geomorphic characteristics, sediment transport, debris flow <br />potential, lateral erosion, and scour. <br />Assumptions: <br />• NTP is received in time to allow WSE to visit the site before snow fall. <br />TASK 4.30 — ChanneI Survey <br />WSE will survey up to eight cross sections and a longitudinal profile of the stream channel as <br />part of the site inspection task above. WSE will merge the stream channel data with the <br />County's survey to develop a single topographic base map required for the hydraulic <br />investigation. <br />Assumptions: <br />County will or has collected detailed topographic data within the road right -of --way. <br />
The URL can be used to link to this page
Your browser does not support the video tag.