My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-11-12-minutes-public-works-study-session
>
Meetings
>
2019
>
11. November
>
2019-11-19 10:00 AM - Commissioners' Agenda
>
2019-11-12-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 10:47:12 AM
Creation date
5/12/2020 10:44:08 AM
Metadata
Fields
Template:
Meeting
Date
11/19/2019
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
57953
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ppEs ... 7Y17p�eC <br />IQTITTAS COUNTY <br />KITTITAS CO <br />DEPARTMENT OF PUBLIC WORKS <br />TASK 3.40 — Construction Support <br />The geotechnical engineer will provide support during construction to respond to RFI's or <br />changes in field conditions. <br />TASK 3.50— Feasibility Review <br />Perform a high level review to determine if a 60 foot bridge span is feasible to eliminate need for <br />cast -in-place concrete abutments. Evaluate existing design for using temporary detour bridge for <br />I year rather than originally anticipated 3 month duration. <br />TASK 3.60— Revise Geotechnical Recommendation for 60ft Span <br />Hart Crowser will provide geotechnical project management and support services, <br />including coordinating staff and conducting telephone consultations and email <br />communications with the design team. Hart Crowser will attend up to two teleconferences. <br />Hart Crowser will conduct engineering analyses to provide revised estimates of ground <br />settlement and abutment stability for a precast concrete abutment system for the revised <br />bridge length. Hart Crowers will also develop geotechnical design parameters and evaluate <br />global stability for the GRS-IBS system alternative. <br />Engineering analysis will be completed in general conformance with appropriate <br />Washington State Department of Transportation (WSDOT) design manuals. <br />Hart Crowser will consult with the design team regarding their findings. <br />Hart Crowser will prepare a geotechnical report supplemental to document their findings <br />and recommendations. The supplement will address design and construction issues, <br />including: <br />Updated foundation design and construction considerations <br />Updated abutment settlement and global stability estimates and construction <br />considerations <br />Geotechnical design parameters for the GRS-IBS system <br />• GRS-IBS settlement and global stability estimates and construction considerations <br />A draft supplement will be provided to the design team for review and comments. A final <br />supplement will be prepared that addresses review comments from the design team. <br />
The URL can be used to link to this page
Your browser does not support the video tag.