Laserfiche WebLink
►��CEN <br />WESTTURY <br />E N G I N E E R I N G <br />Bowers Field Airport Environmental Assessment Page 6 <br />Advanced Design Needs for NEPA Analysis November 27, 2019 <br />CL <br />CL <br />v� <br />m <br />u <br />Cn <br />$ <br />W <br />d <br />a <br />0 <br />My <br />Permit <br />YG7 <br />`- <br />°J � <br />C <br />T '- <br />-0 Cr <br />(Issuing Agency) <br />Submittal Requirements <br />Annotated FIRM showing revised boundary <br />delineations of the: <br />• 100 -year floodplain <br />• 500 -year floodplain <br />I <br />Not <br />Regulatory floodway and how it ties into <br />No <br />Scoped <br />60% <br />Yes <br />the boundary delineation on the effective <br />FIRM at the downstream and upstream <br />ends of the revised reach <br />Cut/fill report <br />I No <br />Not <br />60% <br />Yes <br />Scoped <br />Proposed preliminary plans certified by <br />Not <br />I <br />registered Professional Engineer <br />No <br />Scoped <br />60% <br />Yes <br />Documentation of Endangered Species Act <br />Not <br />compliance <br />No <br />Scoped <br />60% <br />Yes <br />Clean Water Act <br />Project description including description of work <br />Section 404/401 <br />within waters and wetlands <br />Yes <br />25% <br />60% <br />Yes <br />Joint Aquatic <br />Resource Permit <br />Description of construction methods for removal <br />I Yes <br />25% <br />60% <br />Yes <br />and/or fill activities <br />Application <br />(JARPA) <br />Construction timeline <br />Yes <br />25% <br />60% <br />Yes <br />(USAGE and WA <br />Removal volumes, dimensions, duration, and <br />Ecology) <br />materials by wetland/waterbody <br />Yes <br />25% <br />60% <br />Yes <br />Fill volumes, dimensions, duration, and materials <br />by wetland/waterbody <br />Yes <br />25% <br />60% <br />Yes <br />Project purpose and need <br />Yes <br />25% <br />60% <br />Yes <br />Draft and Final Alternatives Analysis <br />No <br />Not <br />60% <br />Yes <br />Scoped <br />Mitigation concept <br />Yes <br />25% <br />60% <br />Yes <br />Identifying and determining required ratios for I <br />Not <br />wetland impact to mitigation I <br />No <br />Scoped <br />60% <br />Yes <br />List of adjacent property owners <br />Yes <br />25% <br />60% <br />Yes <br />Coastal zone certification <br />Yes 25% <br />N/A <br />No <br />Bowers Field Airport Environmental Assessment Page 6 <br />Advanced Design Needs for NEPA Analysis November 27, 2019 <br />