My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-12-11-minutes-ec-study-session
>
Meetings
>
2020
>
01. January
>
2020-01-07 10:00 AM - Commissioners' Agenda
>
2019-12-11-minutes-ec-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 10:33:44 AM
Creation date
5/12/2020 10:33:20 AM
Metadata
Fields
Template:
Meeting
Date
1/7/2020
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
58985
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c. A certified statement of the actual dollar amounts spent, from all funding sources, in completing the <br />Capital Project. This includes the value of in-kind services performed. <br />d. Certification that all costs associated with the project have been incurred and accounted for. Costs are <br />incurred when goods and services are received and/or Agreement work is performed. <br />e. Certification that Grantee is and will continue to provide Community Benefits set forth in Section 5. <br />f. A final invoice voucher for the remaining eligible funds. <br />11. REPORTS <br />a. By October 31, 2020, Grantee must submit written affirmation of project completion by May 31, 2021, <br />unless Grantee has prior submitted a Certified Project Completion Report. <br />b. The Grantee shall furnish WSDA with all other reports specified in other sections of this Agreement and <br />other reports as WSDA may require. <br />c. Failure to file reports as requested may result in termination of this Agreement. <br />12. LACK OF ADEQUATE PROGRESS <br />Grantee's inability to affirm by October 31, 2020 that the project will be complete by May 31, 2021 is a basis for <br />WSDA to terminate the Agreement in whole or in part for cause as provided in Section 27. At WSDA's discretion, <br />the parties may modify this Agreement in lieu of termination, <br />13. EVALUATION AND MONITORING <br />a. The Grantee shall cooperate with and freely participate in any monitoring or evaluation activities <br />conducted by WSDA, including site inspections, if necessary. <br />b. If requested by WSDA, Grantee must provide photographs, either hard copy or electronically, which <br />visually depict the progress made on the project. <br />c. WSDA or the State Auditor and any of their representatives shall have full access to and the right to <br />examine all of the Grantee's records with respect to all matters covered in this Agreement. Such <br />representatives shall be permitted to audit, examine, and make excerpts or transcripts from such records <br />and to make audits of all contracts, invoices, materials, payrolls, and records of matters covered by this <br />Agreement. Such rights last for six (6) years from the date final payment is made. <br />14. SIGNAGE, MARKERS, AND PUBLICATIONS <br />If, during the period covered by this Agreement, the Grantee displays or circulates any communication, <br />publication, or donor recognition identifying the financial participants in the project, any such communication or <br />publication must identify "The State of Washington" and "The Washington State Department of Agriculture — Fairs <br />Program" as participants. <br />15. CODE REQUIREMENTS <br />All construction and rehabilitation projects must satisfy the requirements of applicable local, state, and federal <br />building, mechanical, plumbing, fire, energy and barrier -free codes. Compliance with the Americans with <br />Disabilities Act of 1990, 28 C.F.R. Part 35 will be required, as specified by the local building Department. <br />16. PREVAILING WAGE LAW <br />The project funded under this Agreement is subject to state prevailing wage law (chapter 39.12 RCW). The <br />Grantee is advised to consult the Industrial Statistician at the Washington Department of Labor and Industries to <br />determine the prevailing wages that must be paid. WSDA is not responsible for determining the prevailing wages <br />applying to this project or for any prevailing wage payments that may be required by law. <br />17. RECAPTURE PROVISION <br />a. If Grantee fails to expend state funds in accordance with state law or the provisions of this Agreement, <br />WSDA reserves the right to recapture state funds in an amount equivalent to the principal amount of the <br />grant plus interest. Interest is calculated at the rate of interest on State of Washington general obligation <br />bonds issued most closely to the date of authorization of the grant. Such right of recapture ends three (3) <br />years following expiration or termination of this agreement. <br />b. Repayment by the Grantee of state funds under this recapture provision shall occur within thirty (30) days <br />of demand. If WSDA is required to institute proceedings to enforce this recapture provision, WSDA is <br />entitled to its cost thereof, including reasonable attorney's fees. <br />Kittitas County Fair Page 4 Fair Capital Project Grant <br />K2931 <br />
The URL can be used to link to this page
Your browser does not support the video tag.