Laserfiche WebLink
Snoqualmie Pass Utility District <br />Wastewater Treatment Plant Improvements <br />MLA Pro'ect No. 19022 18090 <br />11/5/2019 <br />PAGE 2 OF 2 <br />Ilt�eom <br />Description <br />Unit <br />Unit Cost <br />(Overall <br />uan ty <br />Overall Cost <br />Phase 111: Lagoon 1 Improvements (Use Phase I bldg for Aeration Equipment) - 2023 completion <br />1 Remove sludge from Lagoon 1 <br />LS <br />$75,000.00 <br />1 <br />$75,000.00 <br />1 Reline Existing La ooni, Com lite <br />LS <br />$200,000.00 <br />1 <br />$200,000.00 <br />2 Lagoon Aeration Equip, Com lets Install in Phase I Bldg) <br />LS <br />$150,000-00 <br />1 <br />$150,000.00 <br />3 Liner Bedding and BaCkfillerie <br />CY <br />Ido.010 <br />3 500 <br />$140.000.00 <br />Phase III Subtotal: <br />$565,000.00 <br />7.9% STATE SALES TAX <br />$44,635.00 <br />TOTAL <br />$609,635.00 <br />Engineering: <br />10% <br />$60,000.00 <br />Construction Services: <br />10% <br />0,000.00 <br />aseIII <br />rarand Total(Inc <br />l-01`5in <br />ont n enc <br />839 080.00 <br />Phase IV: Lagoon 2 sludge removal and Improvements - 2024 completion <br />1 Remove sludge from Lagoon 2 <br />LS <br />$275,000.00 <br />1 <br />$275,000.00 <br />2 Remove piping and aeration d users from Lagoon 2 <br />1 LS <br />50 000.00 <br />1 <br />$50,000.00 <br />Phase III Subtotal: <br />$325,000.00 <br />7.9% STATE SALES TAX <br />$25,675.00 <br />TOTAL <br />$350,675.00 <br />Engineering: <br />10% <br />$35,000.00 <br />Construction Services: <br />10% <br />$35.000.00 <br />Phase IV <br />GrandTotal <br />(including 1 <br />ontin en <br />3 778.00 <br />pmbinde Phase I - IVI <br />S12,381:7:24.00 <br />GAPROJECTSM19091322MI1-5-19 Preliminary Cost EstimateAsx <br />