Laserfiche WebLink
granted by WSDOT. WSDOT Local Programs will administer coordination with headquarters and <br />the Federal Highway Administration as the project includes secured Surface Transportation Block <br />Grant (STBG) funding. Additionally, Department of Commerce will provide oversight and bid <br />package approval as the project includes Community Development Block Grant (CDBG) funding. <br />The City recently entered an interlocal agreement with Kittitas County for providing the City with <br />Certified Acceptance (CA) services. <br />The City welcomes continuing coordination with the Cle Elum Downtown Association and Chamber <br />of Commerce as the project progresses, and anticipates coordinating with the Kittitas County <br />Conservation District. <br />As a part of the revitalizing downtown effort, City staff and assisting consultants have explored a <br />variety of infrastructure improvements needed to help build a sustainable downtown core. <br />Essentially, the grassroots coordination for this infrastructure project was initiated early and broadly. <br />Similar to the First Street and Peoh Avenue, outreach to businesses and residents in close proximity <br />to First Street and Billings Avenue occurred during numerous stages of the design process. A notice <br />of progress is maintained on the City website during the project. <br />6. Explain how the infrastructure project will helpmeet the economic development goals of your community <br />and/or region. If this project is not done, will the anticipated private development still take place? <br />The First Street corridor is one of the original developed areas of the City and has seen few <br />infrastructure improvements. Before Interstate 90, the First Street corridor (State Route 903) was the <br />state highway through Cle Elum, which included right of way of 100 feet. Today, the 100 -foot right <br />of way includes three wide travel lanes ranging in width from 16 to 18 feet, two wide parallel <br />parking lanes ranging in width from 12 to 16 feet, and deteriorated sidewalks ranging in width from <br />10 to 14 feet. Due to the uncharacteristically wide travel and parking lanes and associated safety <br />concerns, pedestrian flow and commerce are scarce, as this geometry primarily caters to passing <br />vehicular travel, all negatively impacting the local economy. <br />In addition to the pedestrian safety concerns and indirect negative economic impacts of the existing <br />wide -street footprint, the large quantity of unmanaged stormwater runoff associated with the <br />expansive impervious area within the First Street corridor must be corrected. <br />Unsafe surface conditions including stormwater ponding and wintertime icing adversely impact <br />pedestrian and passenger vehicle travel, while indirectly impacting corridor businesses as commerce <br />resultingly declines. All residents and businesses within the project area are impacted by the <br />deficient stormwater system. This project is essential to advance the City's overall standard of living <br />by improving current services and safety. If the identified improvements are not completed, there is <br />potential for continued ponding and flooding, significantly impacting the First Street corridor and the <br />community as a whole. The lack of proper stormwater management is resulting in high levels of I&I <br />in the sanitary sewer system which in tum places unnecessary capacity restraints on the City. <br />Alleviating the stormwater-related capacity constraints allows for increased commerce opportunities <br />in the downtown area. Until and unless the stormwater element of the roadway system is addressed, <br />private development is not promotable as the infrastructure systems are unreliable in the First Street <br />corridor. <br />Capacity constraints are not the only scheduling pressure on the improvements for the First Street <br />corridor. The proposed First Street Stormwater Improvements (Phase Two) must be installed before <br />WSDOT completes their scheduled First Street (SR 903) Paver project, scheduled in Spring of 2022. <br />If WSDOT completes paving activities before the stormwater improvements are installed, a five - <br />to <br />