Laserfiche WebLink
2020 Maintenance Rock Materials <br />Bid Opening February 20,2020, at 2:00 p.m. <br />SCHEDULE 'B' <br />Vendor to Provide Labor and Equipment to Load Materiats <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />o <br />10 <br />11 <br />12 <br />13 <br />{la <br />12,000 Ellensburg <br />4,700 East Kittitas <br />5,800 Cle Elum <br />2,400 Ellensburg <br />1,600 Cle Elum <br />4,000 Ellensburg <br />4,000 Cle Elum <br />1,000 Ellensburg <br />1,000 Cle Elum <br />2,000 Ellensburg <br />2,000 Cle Elum <br />1,000 Ellensburg <br />1,000 Cle EIum <br />lT8trt oEScHPnOil <br />BST Crushed Su rfacing 1/2 to No. 4 <br />BST Crushed Surfacing 1/2 to No. 4 <br />BST Crushed Surfacing 1/2 to No. 4 <br />BST Crushed Surfagllrg 3/8 to No. 10 <br />BST CLqted 9yrfacrng 3/8 to No. 1 <br />Maintenance Sand <br />Maintenance Sand <br />1 1/4" Crushed Surfacing Base <br />Course <br />1 1/4" Crushed Surfacing Base <br />Course <br />5/8"c rus hed Su rfaci ng lqp Co urse <br />2112" Ballasl <br />2112" Ballasl <br />Sub-total before Tax - <br />SALES TAX - <br />Ellensburg Gement Products <br />I <br />nruce nen ron I TorAL pRrcE <br />BIDDER <br />PRICE PERITor{ frorn-rrucr <br />$10.60 <br />$10.60 <br />$10.60 <br />$13.75 <br />$13.75 <br />$8.70 <br />$8.70 <br />$8.1 0 <br />$8.10 <br />$8.20 <br />$8.20 <br />$8.00 <br />$8.00 <br />8.00% <br />$127,200.00 <br />$49 820.00 <br />$61,480.00 <br />$33,000.00 <br />$22,000.00 <br />$34,800.00 <br />$34,800.00 <br />$8,100.00 <br />$8,100.00 <br />$16,400.00 <br />$16,400.00 <br />$8,000.00 <br />00 0.00 <br />$428,100.00 <br />$34 248.00 8.00% <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />Total Schedule "B" -$462,348.00 $0.00 <br />SCHEDULE ''B''