Laserfiche WebLink
2020 Maintenance Rock Materials <br />Bid Opening February 20,2020 at 2:00 p.m. <br />SCHEDULE 'A' <br />County to Provide Labor and Equipment to Load Materials <br />ITEl$ <br />t*o. <br />ETTIitATEg <br />QUAilNTY <br />{ln To}*8}Loeaiisn lTEil AEgCRIPTIST{Ellensburg Cement Products <br />I <br />PRrcE PER ToN I rorru, eruce <br />BIDDER <br />PRICE PER <br />TOt'l TOTAL FRICE <br />1 12,000 <br />4,700 <br />5,800 <br />2,400 <br />1,600 <br />Ellensburg <br />East Kittitas <br />BST Crushed Surfacing 1/2 to No. 4 <br />BST Crushed Surfacing 1/2 to No. 4 <br />BST Crushed Surfacing 1/2 to No. 4 <br />BST Crushed Surfacing 3/8 to No. 10 <br />BST Crushed Surfacing 3/8 to No. 10 <br />Maintenance Sand <br />$10.35 <br />$10.35 <br />$10.35 <br />$13.50 <br />$13.50 <br />$124,200.00 <br />$48,645.00 <br />$0.00 <br />$0.002 <br />3 Cle Elum <br />Ellensburg <br />$60,030.00 <br />$32,400.00 <br />$2,600.00 <br />$33,800.00 <br />$0.00 <br />$0.004 <br />5 Cle Elum $o.oo <br />$0.00b4,000 <br />4,000 <br />1,000 <br />Ellensburg $8.45 <br />$8.45 <br />$7.85 <br />$7.85 <br />$7.95 <br />$7.95 <br />$7.95 <br />$7.95 <br />7 <br />8 <br />Cle Elum Maintenance Sand <br />1 1/4" Crushed Surfacing Base <br />Course <br />I 1/4" Crushed Su rfacing Base Courst <br />5/S" Crushed Top Course <br />5/S" Crushed Surfacinq Top Course <br />$33,800.00 <br />$7,850.00 <br />$7,850.00 <br />$15,900.00 <br />$15,900.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />Ellensburg <br />9 1.000 Cle Elum <br />10 2,000 Ellensburg <br />11 2,000 Cle Elum $0.00 <br />$0.00 <br />$0.00 <br />12 1,000 Ellensburg 21l2" Ballasl $7,950.00 <br />13 1,000 Cle Elum 2112" Ballast $7,950.00 <br />$417,875.00 <br />$33,430.00 8.00% <br />Sub-total before Tax -$0.00 <br />$0.00SALES TAX -8.00% <br />Total Schedule "A" -$451,305.00 $0.00 <br />SCHEDULE ''A''