My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res-2019-201 Task Order Amend
>
Meetings
>
2019
>
12. December
>
2019-12-17 10:00 AM - Commissioners' Agenda
>
Res-2019-201 Task Order Amend
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 9:43:48 AM
Creation date
12/27/2019 9:43:42 AM
Metadata
Fields
Template:
Meeting
Date
12/17/2019
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
q
Item
Request to Approve a Resolution to Authorize Chair's Signature on Amendment Number 3 to Jacobs Engineering Task Order Number 3 in the Amount of $88,600 Supporting Final Design of Lick Creek Culvert Replacement
Order
17
Placement
Consent Agenda
Row ID
58634
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~TTITAS COUNTY <br />DEPARTMENT OF PUBLIC WORKS <br />COUNTY to move forward with the delivery of Phase 1 for FHWA while Phase 2 was under <br />continued review. <br />A summary of amended tasks follows: <br />Task 01 -Project Management. This task is amended to provide additional budget to support <br />extended project delivery, including project controls and invoicing, administrative tasks, <br />scheduling, COUNTY and team coordination, meeting attendance, and team direction. <br />Task 02 -Data Analysis. No change. <br />Task 03 -Geotechnical Field Investigation. No change. <br />Task 04 -Geotechnical Engineering Analysis and Report. No change. <br />Task 05 -NEPA/SEPA Documentation. This task is amended to provide additional budget to <br />support the change in project direction. Some task work had to be redone to account for <br />changes to the project and project schedule, including cultural resources coordination and <br />revisions to the project Area of Potential Effect. <br />Task 06 -Documentation, Permit Application, and Acquisition. This task is amended to <br />provide additional budget to support the change in project direction. Some task work had to be <br />redone to account for changes to the project and project schedule, including increased <br />coordination with permitting agencies for both project sites and supporting the COUNTY in <br />sponsorship of the project as a Fish Habitat Enhancement Project through Washington <br />Department of Fish and Wildlife (WDFW) process. <br />Task 07 -Hydraulics. This task is amended to include additional hydraulic modeling efforts, <br />as requested by the COUNTY, including but not limited to requests on behalf of the land owners <br />to assess potential changes in hydraulic conditions; support decisions on the channel location; <br />and update hydraulic and scour parameters for the NF Teanaway Road Crossing. Multiple <br />iterations were run of the 2D model, using different input assumptions to show potential <br />changes to flow depth and velocity during projected storm effects post-construction. This <br />amendment also includes changing the length of the culvert at Story Creek and additional <br />coordination with WDFW to gain their support of the hydraulic design and process Hydraulic <br />Permit Application (HPA). <br />Task 08 -Right of Way. No change. <br />Task 09 -Project Kickoff Meeting. No change . <br />Task 10 -30% Design Support. No change.
The URL can be used to link to this page
Your browser does not support the video tag.