My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Vantage Bay PUD Final Development Plan Index Master File
>
Meetings
>
2019
>
09. September
>
2019-09-17 10:00 AM - Commissioners' Agenda
>
Vantage Bay PUD Final Development Plan Index Master File
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2019 12:47:55 PM
Creation date
9/12/2019 12:41:27 PM
Metadata
Fields
Template:
Meeting
Date
9/17/2019
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Closed Record Hearing to Consider the Vantage Bay PUD Rezone Final Development Plan (RZ-06-00025)
Order
1
Placement
Board Discussion and Decision
Row ID
56434
Type
Conduct closed record hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
411
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
from May to October. These spaces will require 56.23 inches of water per acre or <br />4.69 acre-feet per season v vi <br />- Residential irrigation is developed by multiplying the two lot dimensions by 35% <br />to estimate the amount of total outdoor residential square footage that is irrigated. <br />(i.e. Total residential land irrigated= [(50*100) + (60*100)]*.35=3850 square-feet <br />or 0.0883 acres <br />. <br />- Public spaces and residential unit irrigation require the same base irrigation units <br />per year and as such will be placed in the same category. <br />- Club house consumption is equivalent to one equivalent residential unit. <br />- The Winery’s use will be considered one ERU. (This assumption is subject to <br />change in relation to Winery’s scope of water use) <br />- The community garden uses 3 acre-feet of water per acre vii <br />- Barn usage will be considered part of the community garden for the purposes of <br />this water budget. <br />. <br />- Pool use will be equal to filling the pool twice per year. (size of pool is unknown <br />at this point): Using external data, average pool will need two gallons of water for <br />every gallon of pool volume per year.viii <br />- Xeriscaping creates a 30% reduction in outdoor water usage. <br /> ix <br />- The per-unit area savings from Xeriscaping is 55.8 gallons per square foot (89.6 <br />inches precipitation equivalents) each year <br /> <br />x <br />- Average area in the Xeriscape study group was 2,162 square-feet or 5/100th of an <br />acre. <br />. <br />xi <br />- Outdoor irrigation of residential units is considered part of overall family lot <br />usage. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Index #7
The URL can be used to link to this page
Your browser does not support the video tag.