My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Vantage Bay PUD Final Development Plan Index Master File
>
Meetings
>
2019
>
09. September
>
2019-09-17 10:00 AM - Commissioners' Agenda
>
Vantage Bay PUD Final Development Plan Index Master File
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2019 12:47:55 PM
Creation date
9/12/2019 12:41:27 PM
Metadata
Fields
Template:
Meeting
Date
9/17/2019
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Closed Record Hearing to Consider the Vantage Bay PUD Rezone Final Development Plan (RZ-06-00025)
Order
1
Placement
Board Discussion and Decision
Row ID
56434
Type
Conduct closed record hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
411
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scope of Supply <br />Project: Vantage Washington WWTP 11-05-17 <br />Plant:MBR 300-2 <br />Quote: 10467-O <br />Two (2) Level sensor, submersible <br />Four (4) Backup level switches <br />Piping <br />Interconnection piping between tanks or equipment building not included <br />Process piping will be Sch 80 PVC and Air piping will be SS304 Sch 10. <br />Field Equipment off loading and Installation by others. <br />Wiring <br />All control valves and instruments inside tanks will be pre-wired to junction boxes. <br />Wiring from junction boxes to control panel will be by others. <br />Control Panel <br />One (1) AWC Water control panel <br />Fully automatic plant operation with manual override <br />Allen Bradley Compact Logix programmable logic controller <br />300mm Panel mount HMI screen with CE operating system with data logging feature <br />Nema 4/12 Enclosure, CSA approved <br />UPS <br />VFDs for blowers and pumps. <br />Drawings and manuals <br />One (1) AWC Water P&ID, Mechanical Layout and Electrical Drawings <br />Three (3) O&M manuals <br />Start up & training <br />One (1) 10 Day trip - System testing, and equipment certification <br />One (1) 5 Day trip - Sludge Seeding and Training <br />Warranty <br />12 month period commencing from date of successful performance testing <br /> or 18 months after delivery, whichever is earlier. <br />Pacakge Price: USD $968,000.00 plus applicable taxes. <br />Freight:Freight to site included. Off loading by others. <br />Payment Terms (to be discussed) <br />Index #6
The URL can be used to link to this page
Your browser does not support the video tag.