My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Vantage Bay PUD Final Development Plan Index Master File
>
Meetings
>
2019
>
09. September
>
2019-09-17 10:00 AM - Commissioners' Agenda
>
Vantage Bay PUD Final Development Plan Index Master File
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2019 12:47:55 PM
Creation date
9/12/2019 12:41:27 PM
Metadata
Fields
Template:
Meeting
Date
9/17/2019
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Closed Record Hearing to Consider the Vantage Bay PUD Rezone Final Development Plan (RZ-06-00025)
Order
1
Placement
Board Discussion and Decision
Row ID
56434
Type
Conduct closed record hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
411
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A Withdrawals of groundwateron the subject Compliant Water rights have been <br />property shall be subject to the rules and purchased and a Class A <br />regulations adopted and administrated by the Water System application <br />Washington State Department of Ecology.has been filed with the <br />Washington State <br />Department of Health and is <br />currently under review. <br />B.A minimum 80 foot buffershall be maintained Agreed An updated Biological <br />from the wetlands.Currently, the preliminary plat Resource Review was <br />depicts a bufferthat is over 120 feet from the prepared by Environmental <br />wetlands.Proper signage shall be incorporated Assessment Services in <br />and maintained on-site to encouragethe August 2017 (Appendix B). <br />maintenance of the bufferand natural condition of <br />the shoreline and wetlands. The signage shall be Proper signage will be <br />interpretive in matter, and explains about buffer designated on the final plat <br />integrity requirements and educates about the plans including the plat <br />importance of the area for wildlife,etc.the note.At this time, the 80-foot <br />applicant shall work with the Department of wetland buffer does not <br />Ecology,and County to design and establish the extend past the project <br />signage and a buffer restoration plan.Wetlands property boundaryas shown <br />locations and buffer boundariesshall be on the site plan. <br />delineated on the final Mylar. A plat note shall be <br />included on the final Mylar stating that "All The adjoining propertydevelopmentwillneedtocomplywithKCC17A:owner with the wetland <br />Critical Areas."bufferis Grant County PUD. <br />C.All developmentshall comply with the Kittitas Compliant An updated Biological <br />County Shoreline Master Plan.Lots adjacent to Resource Review was <br />wetland and shoreline areas shall be large prepared by Environmental <br />enough to accommodate a building envelope Assessment Services in <br />which will not intrude into bufferarea or require a August,2017.As a part of <br />variance for build-out.Per Kittitas County Shoreline this update,the OHWM ofMasterProgram,all structures shall be setback a the adjacent shorelines and <br />minimum of 100 feet from the Ordinary High Water wetland were verified <br />Mark of all shorelines.(Appendix B). <br />D.The project shall comply with all requirements of Agreed <br />the Department of Ecology Storm Water Manual <br />for Eastem Washington standards for storm water <br />and shall be collected,retained and disposed of <br />on-site. <br />E.The project shall meet the requirements for a Agreed <br />NPDES Construction Storm Water permit <br />F.All developmentshall comply with Kittitas County Agreed <br />Flood Code Title 14.08. <br />G.On-site drainage features associated with Agreed <br />construction shall be designed such that wetlands <br />are not dewatered or impacted. <br />IV.Noise <br />A All county noise ordinances shall apply to the Agreed <br />project <br />B.Construction activities shall comply with KCC 9.45 Agreed Construction activities will <br />(Noise).only occur between the <br />hours of 6:00 a.m.and 10:00 <br />p.m.,pursuant to KCC <br />9.45.040(1 2). <br />V.Land Use <br />5|Page <br />Index #27
The URL can be used to link to this page
Your browser does not support the video tag.