Laserfiche WebLink
East, drivers appear to be driving the design geometry and managing roadside conditions appropriately <br />to design considerations. <br />No accidents have been reported in the roadway segment in the past five years. <br />FISCAL IMPACTS: <br />The cost of re -posting Taneum Road East to 35 MPH is expected not to exceed $2,000.00. <br />ATTACHMENTS: <br />EXHIBIT 1: Speed Study Request <br />EXHIBIT 2: 2019 Traffic Study Data—Taneum Road East (two studies) <br />EXHIBIT 3: 2009 WTCD, Section 2B. 13 <br />Page 2 of 5 <br />PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS ENGINEER'S REPORT <br />