My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LP-19-00002 Suncadia Ph. 3 Div. 15 & 16 Index Master File
>
Meetings
>
2019
>
09. September
>
2019-09-03 2:00 PM - 2:00pm Public Hearing
>
LP-19-00002 Suncadia Ph. 3 Div. 15 & 16 Index Master File
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2019 12:09:06 PM
Creation date
8/29/2019 12:02:08 PM
Metadata
Fields
Template:
Meeting
Date
9/3/2019
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Public Hearing to Consider the Suncadia Phase 3 Divisions 15 & 16 Preliminary Plat.
Order
1
Placement
2:00pm Public Hearing
Row ID
56118
Type
Hold Public Hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
313
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Part 3 Stormwater Management Plan <br />Introduction <br />The preliminary Stormwater Management Plan for The Phase 3 Divisions 15 & 16 of the <br />Suncadia Master Planned Resort (MPR)is described in this part. The Stormwater Management <br />Plan reflects application of design guidelines detailed in the Department of Ecology Stormwater <br />Management Manuals as well as information presented in the April 1999 (Rev.July 1999) <br />Master Drainage Plan (MDP)that was prepared by W&H Pacific for the MPR.The MDP outlines <br />stormwater design procedures,guidelines,and protocols for the development. <br />Updates to the MDP include: <br />(1)adoption of the drainage standards set forth in Washington State Department of <br />Ecology's Stormwater Management Manual for Western Washington August 2001 <br />(DOE SMM), <br />(2)an addendum to the MDP dated August 2002 that provides (a)water quality protocol <br />information for golf course areas that discharge to surface waters,and (b)revision of <br />golf course water quality protocol summary information for infiltration to conform with <br />the detailed protocol information. <br />Design specifics addressed in this part include: <br />>Runoff rate/volume estimation methodology <br />>Infiltration facility collection and conveyance <br />>Water quality treatment <br />>Overflow routing <br />>Conceptual Stormwater Plan <br />The proposed land use for the resort is shown in the General Site Plan for Phase 3.Phase 3 <br />Divisions 15 &16 is located at the west end of Tumble Creek Drive,northwest of Divisions 6-9 <br />and the Tumble Creek Golf Course. The Suncadia stormwater system will be owned, operated, <br />and maintained by either the Suncadia Residential Owners Association,or the Suncadia <br />Community Council,depending on the location within the resort.Construction of facilities will <br />be by New Suncadia,L.L.C. <br />February 2019 Phase 3 Divisions 15 & 16 Engineering Summary <br />ESM Consulting Engineers,L.L.C.3 -1 <br />\\Esm8\engr\ESM-JOBS\998\718\016\document\P3D15&l6 Eng Summ_Part 3.doc <br />Index #11
The URL can be used to link to this page
Your browser does not support the video tag.