Laserfiche WebLink
Part 3 Stormwater Management Plan <br />Introduction <br />The preliminary Stormwater Management Plan for The Phase 3 Divisions 15 & 16 of the <br />Suncadia Master Planned Resort (MPR)is described in this part. The Stormwater Management <br />Plan reflects application of design guidelines detailed in the Department of Ecology Stormwater <br />Management Manuals as well as information presented in the April 1999 (Rev.July 1999) <br />Master Drainage Plan (MDP)that was prepared by W&H Pacific for the MPR.The MDP outlines <br />stormwater design procedures,guidelines,and protocols for the development. <br />Updates to the MDP include: <br />(1)adoption of the drainage standards set forth in Washington State Department of <br />Ecology's Stormwater Management Manual for Western Washington August 2001 <br />(DOE SMM), <br />(2)an addendum to the MDP dated August 2002 that provides (a)water quality protocol <br />information for golf course areas that discharge to surface waters,and (b)revision of <br />golf course water quality protocol summary information for infiltration to conform with <br />the detailed protocol information. <br />Design specifics addressed in this part include: <br />>Runoff rate/volume estimation methodology <br />>Infiltration facility collection and conveyance <br />>Water quality treatment <br />>Overflow routing <br />>Conceptual Stormwater Plan <br />The proposed land use for the resort is shown in the General Site Plan for Phase 3.Phase 3 <br />Divisions 15 &16 is located at the west end of Tumble Creek Drive,northwest of Divisions 6-9 <br />and the Tumble Creek Golf Course. The Suncadia stormwater system will be owned, operated, <br />and maintained by either the Suncadia Residential Owners Association,or the Suncadia <br />Community Council,depending on the location within the resort.Construction of facilities will <br />be by New Suncadia,L.L.C. <br />February 2019 Phase 3 Divisions 15 & 16 Engineering Summary <br />ESM Consulting Engineers,L.L.C.3 -1 <br />\\Esm8\engr\ESM-JOBS\998\718\016\document\P3D15&l6 Eng Summ_Part 3.doc <br />Index #11