My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LP-19-00002 Suncadia Ph. 3 Div. 15 & 16 Index Master File
>
Meetings
>
2019
>
09. September
>
2019-09-03 2:00 PM - 2:00pm Public Hearing
>
LP-19-00002 Suncadia Ph. 3 Div. 15 & 16 Index Master File
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2019 12:09:06 PM
Creation date
8/29/2019 12:02:08 PM
Metadata
Fields
Template:
Meeting
Date
9/3/2019
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Public Hearing to Consider the Suncadia Phase 3 Divisions 15 & 16 Preliminary Plat.
Order
1
Placement
2:00pm Public Hearing
Row ID
56118
Type
Hold Public Hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
313
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Part 2 Roadway Plan <br />Illumination <br />Street lighting designs will conform to the principals of preserving dark skies while providing <br />lighting levels appropriate for roadway safety and security.Street lighting will conform to the <br />following planning criteria. <br />a)Use of full-cutoff shielding on outdoor light fixtures; <br />b)Mounting of light fixture luminaries at a height of not greater than 30 feet; <br />c)Establishment of roadway lighting standards based on needed light distribution <br />and the luminance of roadway surfaces; <br />d)Use of LED street lights; <br />e)Use of timer or photo-cell controls to regulate when and where lighting would <br />occur;and <br />f)Avoiding unnecessary lighting of building facades. <br />Streetlights will be located at intersections,pedestrian trail crossings, and other locations <br />where needed. Alternative luminary styles will be considered during project design. <br />February 2019 Phase 3 Divisions 15 & 16 Engineering Summary <br />ESM Consulting Engineers, L.L C 2 -4 <br />\\Esm8\engr\ESM-JOBS\998\718\016\document\P3Dl5&l6 Eng Summ_Part 2 doc <br />Index #11
The URL can be used to link to this page
Your browser does not support the video tag.