My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LP-19-00002 Suncadia Ph. 3 Div. 15 & 16 Index Master File
>
Meetings
>
2019
>
09. September
>
2019-09-03 2:00 PM - 2:00pm Public Hearing
>
LP-19-00002 Suncadia Ph. 3 Div. 15 & 16 Index Master File
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2019 12:09:06 PM
Creation date
8/29/2019 12:02:08 PM
Metadata
Fields
Template:
Meeting
Date
9/3/2019
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Public Hearing to Consider the Suncadia Phase 3 Divisions 15 & 16 Preliminary Plat.
Order
1
Placement
2:00pm Public Hearing
Row ID
56118
Type
Hold Public Hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
313
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Part 2 Roadway Plan <br />Discussed in this part of Phase 3 Divisions 15 &16 are parking,access, and illumination. <br />RoadwayClassifications <br />The Phase 3 Divisions 15 & 16 roads shown in the Site Development Plan are classified as <br />follows: <br />Road Conceptual Master Plan Classification <br />Extension of Tumble Creek Drive Primary Traffic Circulation <br />Easton Ridge Trail _Primary Traffic Circulation (for Division 15 lots 1-26) <br />Easton Ridge Trail SecondaryTraffic Circulation (for Division 15 lots 27-56) <br />Red Mountain Way Primary Traffic Circulation (for Division 16 lots 1-39) <br />Red Mountain Way SecondaryTraffic Circulation (for Division 16 lots 40-49) <br />Mt.Bald Drive <br />¯ <br />\Secondary Traffic Circulation <br />Roadway Sections <br />The proposed roadway sections for the project are shown in Figures 2-1 and 2.2.Applicability <br />of the sections is as follows: <br />Road Type Figure <br />Extension of Tumble Creek Drive R-V -Major Residential -Two-Way 2-2 <br />Alternative #2 <br />Easton Ridge Trail R-V -Major Residential -Two-Way 2-2 <br />(for Division 15 lots 8-26)Alternative #2 <br />Easton Ridge Trail R-Il -Minor Residential-Two-Way 2-3 <br />(for Division 15 lots 27-56) <br />Red Mountain Way R-I -Major Residential -Two-Way 2-1 <br />(for Division 16 lots 1-39) <br />Red Mountain Way R-Il -Minor Residential -Two-Way 2-4 <br />(for Division 16 lots 40-49)Alternative #2 <br />Mt.Bald Drive R-I -Major Residential-Two-Way 2-1 <br />Access <br />PRIMARY ACCESS:As illustrated on the General Site Plan,primary access to the project site <br />from Bullfrog Road to Tumble Creek Drive to Easton Ridge Trail looping back to Tumble Creek <br />Drive along Mt.Bald Drive and Red Mountain Way. <br />SECONDARY ACCESS:As illustrated on the General Site Plan,secondary access to the project <br />site along the extensions of Easton Ridge Trail and Red Mountain Way, past Mt.Bald Drive. <br />February 2019 Phase 3 Divisions 15 & 16 Engineering Summary <br />ESM Consulting Engineers,L.L.C.2 -1 <br />\\Esm8\engr\ESM-JOBS\998\718\016\document\P3Dl5&l6 Eng Summ_Part 2.doc <br />Index #11
The URL can be used to link to this page
Your browser does not support the video tag.