My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LP-19-00002 Suncadia Ph. 3 Div. 15 & 16 Index Master File
>
Meetings
>
2019
>
09. September
>
2019-09-03 2:00 PM - 2:00pm Public Hearing
>
LP-19-00002 Suncadia Ph. 3 Div. 15 & 16 Index Master File
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2019 12:09:06 PM
Creation date
8/29/2019 12:02:08 PM
Metadata
Fields
Template:
Meeting
Date
9/3/2019
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Public Hearing to Consider the Suncadia Phase 3 Divisions 15 & 16 Preliminary Plat.
Order
1
Placement
2:00pm Public Hearing
Row ID
56118
Type
Hold Public Hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
313
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Part 1 Introcluction <br />Information presented in this document pertains to the proposed roads,illumination,drainage, <br />water and sewer facilities,and solid waste management program to serve the Phase 3 Divisions <br />15 &16 plats. <br />Information on the proposed roads reflects the requirements of Exhibit J to the Development <br />Agreement.Information on storm drainage reflects the requirements of the Department of <br />Ecology Stormwater Management Manuals,the 1999 Master Drainage Plan and preliminary <br />stormwater engineering for Phase 3. <br />Information on the proposed water supply, storage and distribution system,is taken from the <br />2013 Water System Plan as revised January 2016.The development will be served by the <br />Suncadia Water Company,a Class A water system regulated by the Department of Health. <br />Information on the proposed sewage collection,treatmentand disposal system is taken from <br />preliminary engineering for Phase 1 and the March 2000 Site Engineering Technical Summary <br />document for the MPR (Appendix A of the FEIS). <br />February 2019 Phase 3 Divisions 15 &16 Engineering Summary <br />ESM Consulting Engineers,L.L.C.1 -1 <br />\\Esm8\engr\ESM-JOBS\998\718\016\document\P3D15&l6 Eng Summ_Part 1.doc <br />Index #11
The URL can be used to link to this page
Your browser does not support the video tag.