My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LP-19-00002 Suncadia Ph. 3 Div. 15 & 16 Index Master File
>
Meetings
>
2019
>
09. September
>
2019-09-03 2:00 PM - 2:00pm Public Hearing
>
LP-19-00002 Suncadia Ph. 3 Div. 15 & 16 Index Master File
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2019 12:09:06 PM
Creation date
8/29/2019 12:02:08 PM
Metadata
Fields
Template:
Meeting
Date
9/3/2019
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Public Hearing to Consider the Suncadia Phase 3 Divisions 15 & 16 Preliminary Plat.
Order
1
Placement
2:00pm Public Hearing
Row ID
56118
Type
Hold Public Hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
313
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.Water [helo1 <br />a.Surface Water: <br />1)Is there any surfacewater body on or in the immediate vicinity of the site (including <br />year-round and seasonal streams,saltwater,lakes, ponds,wetlands)?If yes,describe type and <br />provide names.If appropriate,state what stream or river it flows into. [helD1 <br />Please see Section B.3.a(1)of attachment. <br />2)Will the project require any work over,in, or adjacent to (within 200 feet)the described <br />waters?If yes,please describe and attach available plans. [helol <br />Tumble Creek Drive and lot development is proposed within 100 feet of Wetlands 27,35, & 39,outside buffers. <br />3)Estimate the amount of fill and dredge material that would be placed in or removed <br />from surface water or wetlands and indicate the area of the site that would be affected. <br />Indicate the source of fill material.[helpl <br />None. <br />4)Will the proposal require surface water withdrawals or diversions? Give general <br />description,purpose, and approximate quantities if known. thelol <br />Please see Section B.3.a(4)of attachment. <br />5)Does the proposal lie within a 100-yearfloodplain?If so,note location on the site plan.thelol <br />No. <br />6)Does the proposalinvolve any discharges of waste materials to surface waters?If so, <br />describe the type of waste and anticipatedvolume of discharge.thelol <br />No. <br />b.Ground Water: <br />1)Will groundwater be withdrawnfrom a well for drinking water or other purposes?If so,give a <br />general description of the well,proposed uses and approximatequantitieswithdrawn from the well. <br />Will water be discharged to groundwater?Give general description,purpose,and approximate <br />quantities if known.thelD1 <br />No. <br />2)Describe waste material that will be discharged into the groundfrom septic tanks or <br />other sources,if any (for example:Domestic sewage;industrial,containing the <br />following chemicals. . .;agricultural;etc.).Describe the general size of the system,the <br />number of such systems, the number of houses to be served(if applicable),or the numberof <br />animals or humans the system(s)are expected to serve.thelol <br />None. <br />c.Water runoff (includingstormwater): <br />SEPA Environmental checklist (WAC 197-11-960)July 2016 Page 4 of 13 <br />Index #8
The URL can be used to link to this page
Your browser does not support the video tag.