Laserfiche WebLink
B.ENVIRONMENTAL ELEMENTS [helol <br />1.Earth [helol <br />a.Generaldescription of the site:[helol Generally slopes to the northeast. <br />(circle one): Flat, rolling,steep slopes,mountainous,other <br />b.What is the steepest slope on the site (approximate percent slope)?[helD1 <br />The slopes on the site range from 1 to 40 percent. <br />c.What general types of soils are found on the site (for example,clay, sand,gravel,peat, <br />muck)?If you know the classification of agricultural soils,specify them and note any agricultural land <br />of long-term commercial significance and whether the proposal results in removingany of these soils. <br />thelpl <br />Soils on the site consist primarily of glacial outwash with some Ronald moraine deposits. <br />d.Are there surface indications or history of unstable soils in the immediate vicinity?If so, <br />describe.thelol <br />Please see Section B.1.d of attachment. <br />e.Describe the purpose,type,total area,and approximate quantities and total affected area of any filling, <br />excavation,and grading proposed. Indicate source of fill. [helol <br />Please see Section B.1.e of attachment. <br />f.Could erosion occur as a result of clearing, construction,or use?If so,generally describe.thelD1 <br />Please see Section B.1.d of attachment. Furthermore,the TESCP program in place for the resort will be utilized. <br />g.About what percent of the site will be covered with impervioussurfaces after project <br />construction (for example,asphalt or buildings)?[helol <br />Approximately 13%of the plat area from the constructed building roofs,driveways,and roads. <br />h.Proposed measures to reduce or control erosion,or other impacts to the earth,if any: thelol <br />Please see Section B.1.h of attachment.Furthermore,the TESCP program in place for the resort will be utilized. <br />2.Air [helD1 <br />a.What types of emissions to the air would result from the proposal during constructionsoperation,and <br />maintenance when the project is completed?If any,generallydescribe and give approximate <br />quantities if known.thelol <br />Please see Section B.2.a of attachment. <br />b.Are there any off-site sources of emissions or odor that may affect your proposal?If so, <br />generally describe.thelol <br />No off-site sources of emissions or odor are anticipated to affect the proposal. <br />c.Proposed measures to reduce or control emissions or other impacts to air,if any:thelol <br />See Phase 3 area in the Erosion Control Plan and the MPR Conditions of Approval sections B-42 through B-45. <br />SEPA Environmental checklist (WAC 197-11-960)July 2016 Page 3 of 13 <br />Index #8