My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BLM-KCSO 2019 Contract and SOW
>
Meetings
>
2019
>
08. August
>
2019-08-06 10:00 AM - Commissioners' Agenda
>
BLM-KCSO 2019 Contract and SOW
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2019 2:16:42 PM
Creation date
8/13/2019 2:15:58 PM
Metadata
Fields
Template:
Meeting
Date
8/6/2019
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
n
Item
Request to Acknowledge the 2019 Contract and Statement of Work between the Bureau of Land Management and the Kittitas County Sheriff's Office
Order
14
Placement
Consent Agenda
Row ID
55546
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KinilaS County Law Enfun:i:nu:nt Services, Washington Stat,: <br />BLM-W A Spokane District Office <br />CONTR.\CT ADI\UNISTRATIO~ DATA <br />The following local clauses arc provided in full text: <br />PURCHASE ORDER NO. 140L-1319P009~ <br />Page9 of26 <br />CONTRACTOR PERFORMANCE ASSESSMENTREPORTING SYSTEM (JULY 2010) <br />(a) FAR 42.1S02 directs all Federal agencies to collec1 past perfonnance information on contracts . The <br />Department of the Interior (DOI) has implemented the Contractor Performance Asscs.~mcnt Reporting System <br />(CPARS) to comply with this regulation. One or more pasc performance evaluations will be conducced in order <br />to record your contract perfonnance as required by FAR42 .15. <br />(b) The past perfonnance evaluation process is a totally paperless process using CPARS. CPARS is a weir <br />based system that allows for electronic processing or the perfonnance evalualion report. Once the report is <br />processed. it is available in the Past Perfonnance Information Retrieval System (PPIRS) for Government use in <br />evaluating past perfonnana: as part of a source selection action. <br />(c) We request that you furnish the Contracting Officer with the name. position title, phone number, and erooil <br />address for each person designated to have access to your finn's past performance evaluation(s) for the <br />contract no later than 30 days arter award. Each person granted access will have the ability to provide <br />comments in the Contractor portion of the report and state whether or not the Contractor agrees with the <br />evaluation. before returning the report to the Assessing Official. The report information must be protected as <br />source selection sensitive infonnalion not releasable to the public. <br />( d) When your Contractor Represcntative(s) (Past Pcrfonnancc Points of Contact) are registered in CPARS, <br />they will receive an automatically-generated email with detailed login instructions. Further details, systems <br />requirements, and training information for CPARS is available at h1t p~·1www .cpnr s1csd1djsa,mi U, The CPARS <br />User Manual, registration for On Line Training for Contractor Representatives. and a practice application <br />may be found at this site. <br />te) W1thm 60 days alter the end ol a pc rt ormance penod, tlie Contntcung Oif1cer-wdl complete an mtenm or <br />final past performance evaluation, and the report will be accessible at hu p,:Jww ..CAA!1'-C!.~d.di :,n.m il f. Contractor <br />Representatives may then provide comments in response to the evaluation, or return the evaluation without <br />comment. Comments ~ limited to the space provided in Block 22. Your comments should focus on objective <br />facts in the Assessing Official's narrative and should provide your views on the causes and ramifications of the <br />assessed pcrfonnance. In addition to the ratings and supporting narratives, blocks 1 -17 should be reviewed for <br />accuracy, as these include key fields that will be used by the Government to identify your finn in future source <br />selection actions. If you elect Jl9i to provide commenLc;, please acknowledge receipt of the evaluation by <br />indicating "No comment" in Block 22, and then signing and dating Block 23 of the form. Without a statement <br />in Block 22, you will be unable to sign and submit the evaluation back to the Government . If you do not sign <br />and submit the CPAR wichin 30 days, it will automatically be returned to the Government and will be <br />annotated: "The report was deliveredfreceived by the contractor on (date). The contractor neither signed nor <br />offered comment in response to this assessment. 11 Your response is due within 30 calendar days after receipt of <br />the CPAR. <br />(f) The following guidelines apply concerning your use of lhe past performance evaluation: <br />(I) Protect the evaluation as "source selection information. 11 After review, transmit the evaluation by <br />completing and submitting the form through CPARS. If for some reason you arc unable to view and/or <br />submit the fonn through CPARS, contact the Contracting Officer for instructions.
The URL can be used to link to this page
Your browser does not support the video tag.