My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RZ-07-00008 Dunford FPUD Enabling Documents
>
Meetings
>
2019
>
08. August
>
2019-08-06 10:00 AM - Commissioners' Agenda
>
RZ-07-00008 Dunford FPUD Enabling Documents
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2019 2:41:07 PM
Creation date
8/1/2019 2:40:21 PM
Metadata
Fields
Template:
Meeting
Date
8/6/2019
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
r
Item
Request to Approve a Resolution In the Matter of Approval of the Final Development Plan for Dunford Planned Unit Development (RZ-07-00008& LL-08-00002).
Order
18
Placement
Consent Agenda
Row ID
55546
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stage 9 will include the final platting, development and sale of Lots 18-22 and 45-50 including <br />the associated construction requirements including but not limited to road construction,storm <br />water construction,dry and wet utilities,and additional recreational facilitates. <br />Stage 10 will include the final platting,development and sale of Lots 23-26 and 41-44 including <br />the associated construction requirements including but not limited to road construction, storm <br />water construction, dry and wet utilities,and additional recreational facilitates. <br />Stage 11 will include the final platting,development and sale of Lots 27-31 and 40 including the <br />associated construction requirements including but not limited to road construction,storm water <br />construction,dry and wet utilities,and additional recreational facilitates. <br />Stage 12 will include the final platting,development and sale of Lots 32-34 and 38-39 including <br />the associated construction requirements including but not limited to road construction,storm <br />water construction,dry and wet utilities,and additional recreational facilitates. <br />Stage 13 will include the final platting,development and sale of Lots 35-37 including the <br />associated construction requirements including but not limited to road construction,storm water <br />construction,dry and wet utilities,and additional recreational facilitates. <br />Notes Affecting Staging Plan: <br />1.Construction of the model home,communitybuilding which will operate as the <br />construction management office and a sales center,recreational facilities along with <br />agriculture and equestrian buildings may proceed any stage.If said facilities are built <br />prior to the completion of the access occupancy permits for these facilities will be issued <br />upon their completion. <br />2.Amenity and recreation facility construction and operation,including indoor and outdoor <br />facilities,if built,may be built and operated during the construction of any Stage and <br />receive occupancy permits upon completion. <br />3.Recreation and farming use of the property will continue during all Stages. <br />Attachment C
The URL can be used to link to this page
Your browser does not support the video tag.