Laserfiche WebLink
approval for the Final Development Plan,the four-lot short plat associated with this PUD will be <br />completed and filed with the Kittitas County Auditor's Office. <br />Stage 2 will include logging as required for the road right of way and may include logging of <br />building sites and complete fire wise activity in parts of the development. <br />Stage 3 will include,but not be limited to,the construction of the domestic water system,the <br />intersection of the internal road system with State Highway 97, the construction of a portion the <br />internal road system and the construction of the dry utilities as required. <br />Stage 4 will include the construction of a portion of the recreational facilities possibly including <br />but not limited to trails,barns,arenas,recreational center,model home and sales office. <br />Stage 5 will include the final platting,development and sale of Lots 1-5 and 58-65 includingthe <br />associated construction requirements including but not limited to road construction, storm water <br />construction, dry and wet utilities,and additional recreational facilitates. <br />Stage 6 will include the final platting, development and sale of Lots 6-9 and 55-57 including the <br />associated construction requirements including but not limited to road construction, storm water <br />construction,dry and wet utilities,and additional recreational facilitates. <br />Stage 7 will include the final platting,development and sale of Lots 10-13 and 52-56 including <br />the associated construction requirements including but not limited to road construction,storm <br />water construction, dry and wet utilities,and additional recreational facilitates. <br />Stage 8 will include the final platting,development and sale of Lots 14-17 and 48-51 including <br />the associated construction requirements including but not limited to road construction, storm <br />water construction,dry and wet utilities,and additional recreational facilitates. <br />Attachment C