Laserfiche WebLink
Printed:6/27/2016 2:53.39 PM O-2260-16.sbs Page 8 of 9 <br />Section 3 -Execution Continued... <br />3.01 Erection Countinued... <br />Accessories: <br />Install gutters,downspouts,flashings,trim,ridge covers,roof curbs,pipe flashings,closure strips,roof jacks,and other accessories and sheet metal items in accordancewithManufacturer's recommendations for positive attachment to building and provide a weathertight mounting. <br />3.02 Paintine <br />Touch-up all abrasions,scratches,field welds or other damages in shop-coat or factory-finished painted surfaces consistent with shop coat,or factory-finished painting. <br />Provide finish coats which are compatible with metal building Manufacturer's shop coat paints if required. <br />If finish coat is not compatible with shop coat provide approved barrier coats over incompatible shop coats.All finish coats by others should be solvent base orapprovedbyStarBuildingSystems'. <br />3.03 Tolerances <br />All framing members shall be erected plumb,level or aligned not to exceed a deviation 1:500 (1:1000 for Canadian Projects).