My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RZ-07-00008 Dunford FDP Master File
>
Meetings
>
2019
>
07. July
>
2019-07-16 10:00 AM - Commissioners' Agenda
>
RZ-07-00008 Dunford FDP Master File
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 12:05:53 PM
Creation date
7/11/2019 12:02:14 PM
Metadata
Fields
Template:
Meeting
Date
7/16/2019
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Request to Conduct a Closed Record Hearing to Consider Approval of the Dunford PUD Final Development Plan (RZ-07-00008 and LL-08-00002)
Order
1
Placement
Board Discussion and Decision
Row ID
55172
Type
Conduct closed record hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
250
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 8 revised/updated by Kittitas County 6/21/2018 b. Maintenance of driveway approaches shall be the responsibility of the owner whose property they serve. The County will not maintain accesses. c. Any further subdivision or lots to be served by proposed access may result in further access requirements. B.28 Private Road Maintenance Agreement: The applicant shall meet all applicable conditions of any pre-established or required Private Road Maintenance Agreements. The applicant did not submit documentation regarding this requirement at this stage. This will be reviewed prior to final plat approval. Satisfied B.29 Lot Closure: It is the responsibility of the Professional Licensed Surveyor (PLS) to ensure the lot closures are correct and accurate. The applicant did not submit documentation regarding this requirement at this stage. This will be reviewed prior to final plat approval. Satisfied B.30 Access Permit: An approved access permit shall be required from the Department of Public Works prior to creating any new driveway access or performing work within the county road right of way. The applicant did not submit documentation regarding this requirement at this stage. This will be reviewed prior to final plat approval. Satisfied B.31 Addressing: Contact the Kittitas County Rural Addressing Coordinator at (509) 962-7523 to obtain addresses prior to obtaining a building permit. A parcel cannot receive a building permit or utilities until such parcel is identified with a 911 address. The applicant did not submit documentation regarding this requirement at this stage. This will be reviewed prior to final plat approval. Satisfied B.32 Mailbox Placement: The U.S. Postal Service requires that private roads with 6 or more residences Install USPS approved Cluster Box Units (CBUs) at a safe location at the mouth of the private road. Contact your local Post Office for location and additional design requirements before beginning construction. BPA Easement: The subject property contains a BPA easement with power lines and associated minimum buffers. If proposed PUD will include improvements made within the BPA easement, i.e. a road, then a Land Use Application from the BPA must be submitted to and approved by the BPA. This application can be found on the BPA website at The applicant did not submit documentation regarding this requirement at this stage. www.transmission.bpa.gov/ LanCom/Real_Property.cfm. Please note that the current application fee is $250, and the review process typically takes 8-10 weeks. Upon review and approval of the application, BPA will issue a Land Use Agreement which will be provided to the Applicant and the County. The applicant did not submit documentation regarding this requirement at this stage. This will be reviewed prior to final plat approval. Satisfied B.33 Plat Note Statement: The final recorded large lot plat and development plan shall include the following statement as a note: The approval of this division of land includes no guarantee that there is a legal right to withdraw groundwater within the land division. The approval of this division of land provides no guarantee that use of water under the ground water exemption (RCW 90.44.050) for this plat or any portion thereof will not be subject to curtailment by the Department of Ecology or a court of law. The applicant did not submit documentation regarding this requirement at this stage. Not Satisfied: This note will need to be added for final development plan approval. B.34 The Public Health Department’s recommendation for final approval shall be conditioned upon the developer/owner of the PUD providing proof of water availability. For final approval, the public water system application shall be submitted, reviewed and approved by the State of Washington, Department of Health which includes final issuance of the water system ID number. If expansion of an existing public water system is proposed, documentation of the approval from Washington State Department of Health shall be submitted to the Kittitas County Health Department The applicant states that an existing water right is attained and expansion will proceed through the appropriate county and state agencies as required. The applicant submitted exhibit 6, a Water System Plan approved by the Washington State Department of Health in 2011. The document states that it expires in August 2014 without an approved update. No update is provided. KCC Public Health acknowledges a water right held by the applicant (Hidden Valley Satisfied Index #13
The URL can be used to link to this page
Your browser does not support the video tag.