SIO SUMMARY
<br />BIDDER81
<br />SIDDER92
<br />BIDOER03
<br />Owner: CITY OF CLE ELUM
<br />project: SR 003 UTILITY EXTENSIONS
<br />HLA Project Nor, IBIO1
<br />Bid Opanln00at.: July B, 2019
<br />DIB ConSWGIOn,
<br />P O. Box 2138
<br />Wenatchee, WA
<br />LLC
<br />98007
<br />Granite Constmchon
<br />80 Pond Road
<br />Yakima, WA 90901
<br />Company
<br />Advantage Dirt C.M.1chi
<br />P 0, Sox 1011
<br />Nitlitas, WA 98934
<br />Inc
<br />Item
<br />No.
<br />Item Descritin
<br />D
<br />Unit
<br />Ouantlly
<br />ENGINEER'S
<br />ESTIMATE
<br />Un4 be Amount
<br />Unit Price
<br />Amount
<br />Unil Price
<br />Amount
<br />unit Price I
<br />Amount
<br />SCHEDULE C - NUMBER 5 MINE ROAD & SR 903 WATER
<br />EXTENSION
<br />24
<br />Minor Change
<br />FA
<br />EST.
<br />$500000
<br />(51000.00
<br />$5.000.00
<br />15000.00
<br />$5000.00
<br />$5,00000
<br />$5,000.00
<br />$5,000.00
<br />25
<br />Mo011aalion
<br />LS
<br />1
<br />$9,000.00
<br />$9.000.00
<br />(14,00000
<br />$14,000.00
<br />$2,000.110
<br />$2.00000
<br />51,001.17
<br />$1,00717
<br />26
<br />Protect Temporary Traffic Control
<br />LS
<br />1
<br />$2,00000
<br />$2,000.00
<br />$1,000.00
<br />51,00000
<br />$2,500.00
<br />$2,50000
<br />$10.87173
<br />$10,811)3
<br />27
<br />Clearing and Grubbing
<br />LS
<br />1
<br />$70,000.00
<br />$70,00000
<br />$4,500.00
<br />$4,500.00
<br />$5.700.00
<br />$5,700.00
<br />526,939.02
<br />$25939.021
<br />28
<br />Crushed Sudacin9 Base Corrie
<br />TON
<br />325
<br />$45.00
<br />$14,525.00
<br />$35.00
<br />$11,375.00
<br />$20.00
<br />$8,500.00
<br />52571
<br />$9,330.75 Z
<br />29
<br />Crushed Surfacing Top Course
<br />TON
<br />140
<br />$4500
<br />$6.30000
<br />$35.00
<br />$4,90000
<br />$2000
<br />$2,80000
<br />13165
<br />$4,431.00
<br />30
<br />HMA Cl. 112 -Inch PG fi4-28
<br />TON
<br />145
<br />$14000
<br />$20,30000
<br />$150.00
<br />$21,75000
<br />$130,00
<br />$18,85000
<br />$17678
<br />$25,633.10
<br />31
<br />Shoring or Extra Excavation
<br />LF
<br />1,510
<br />54.00
<br />$6,040.00
<br />$1.00
<br />$1,510.00
<br />$1.00
<br />$1.510.00
<br />$1.65
<br />$2.491.50
<br />32
<br />Select Backfill, as Directed
<br />CY
<br />85
<br />$40.00
<br />$2,600.00
<br />$7000
<br />$20.00
<br />$1.820.00
<br />$68.56
<br />$4,456.40
<br />33
<br />C -90D PVC Pipe lot Water Main 121n. Olam.
<br />LF
<br />1,510
<br />$60,00
<br />190,60000
<br />$47.00
<br />$55,00
<br />583,05000
<br />$52.19
<br />$18,806.90
<br />34
<br />C-900 PVC Pipe for Water Main 6 ln, Dam,
<br />LF
<br />70
<br />$65.00
<br />$4,55000
<br />$129.00
<br />"$70,970.00
<br />$34.00
<br />52380,00
<br />$4410
<br />$30810035
<br />Tapping Sleeve and Valve Assembly 121rt
<br />EA
<br />1
<br />$4500.00
<br />$4,500.00
<br />$0,00000
<br />$12,60000
<br />$12.600.00
<br />$10,715.55
<br />$10,775.55
<br />36 1
<br />Embody Valva 121n.
<br />EA
<br />4
<br />$2.00000
<br />$8,000.00
<br />$2,000.00
<br />10.000.00
<br />$3,00000
<br />$12,00000
<br />$2,64140
<br />$to565-
<br />37
<br />Gate Valve B In.
<br />EA
<br />2
<br />$1,000.00
<br />$3,60D 00
<br />51,10000
<br />$3,40000
<br />$2.400.00
<br />$1,100.00
<br />$2,16601
<br />$4,332.02
<br />38
<br />Gate Valve 6In.
<br />EA
<br />2
<br />$1,600.00
<br />$3,20000
<br />$1,100.00
<br />§2,200.00
<br />$1,900.00
<br />$3,800.00
<br />$1,757.53
<br />$3,515.06
<br />39
<br />Como, Air ReieaselAir Vacuum Valve Assam by 2 In.
<br />EA
<br />2
<br />$4,00000
<br />$0,00000
<br />$5,000.00
<br />$10,00000
<br />56,860.00
<br />(13,720.00
<br />45,05503
<br />$10,111.66
<br />40
<br />Hydrant Assembty
<br />EA
<br />6
<br />$4.500.00
<br />$27,000,00
<br />$5,000.00
<br />$30,000.00
<br />36,50000
<br />$39,00000
<br />$4,557.97
<br />$27,347.82
<br />41
<br />Bottom
<br />EA
<br />18
<br />$34500
<br />$5.44000
<br />$400.00
<br />$6,400.00
<br />$69000
<br />$11.04000
<br />$595.36
<br />$8,525.76
<br />42
<br />Service Conneplon 2 In. Dam.
<br />EA
<br />1
<br />$220000
<br />(2,20000
<br />$6,000.-
<br />§8,00000
<br />51,6-.00
<br />11600.00
<br />$541634
<br />$5,476.34
<br />43
<br />HOPE OR11 Pipe for Watermain 12In, Diem.
<br />LF
<br />95
<br />$70,-
<br />$8,65000
<br />5111000
<br />19,5-.00
<br />$14700
<br />$13,96500
<br />$139.57
<br />$13.259.15
<br />SCHEDULE C SUBTOTAL
<br />$290,605.00
<br />1252,085.00
<br />$244,635.00
<br />$256,963.53
<br />8.0% STATE SALES TAX
<br />$23,968.40
<br />518,568.80
<br />$19,570.80
<br />521,351.08
<br />SCHEDULE CTOTAL
<br />$323,57340
<br />E350,65L80
<br />$264205.00
<br />$288,320.61
<br />
|