Laserfiche WebLink
Filed tor Record 04/16/2009 04 :48:53 PM -Kittitas County, WA Auditor -200904160090 Page 85 of 118 <br />C-3 Sjgnal at Bullfr g Entra nce. (Intentionally deleted) <br />C-4 Bull frog/S R 903 Jntcrsection, (Intentionally deleted) <br />C-5 Baseline Traffic Volumes and Initial Annual Backgre und Growth Rate Assumption. The <br />applicant shall conduct traffic volume monitoring on August 25 through September 4, 2000, to <br />detemtine a baseline traffic volume for purposes of calculating proportionate share. Once this <br />baseline traffic volume data has been collected, it shall be compared to the traffic volume data <br />from the MPR-FEIS, collected in 1997, to determine an the Initial Annual Background Growth <br />Rate Assumption, which will be used in calculating proportionate shares for all traffic impact <br />mitigation assessed on site development plans and/or preliminary plat applications filed within 5 <br />years of the date of this MPR approval, the "Effective Date," as defined in the Development <br />Agreement. The Initial Annual Background Growth Rate Assumption ("IBG") shall be <br />calculated as follows: <br />RJJG = (V JV 2000 <br />. -1] X I 000/o <br />11'1997 <br />RBG = initial background growth rate <br />RBG'"' = revised background growth rate after year 5 <br />TV, = total volume in year x <br />BV~ = background volume in year x, defined as TV, -MPRV, <br />MPRV, = master planned resort volume in year x <br />If the resulting Initial Annual Background Growth Rate Assumption is substantially different <br />than that identified in the MPR-FEIS, then additional evaluation of an appropriate Initial Annual <br />Background Growth Rate Assumption shall be completed by the County for detemtining <br />proportionate shares. <br />C-5A Revised Annual Background Growth Rale Assumption. After the first five years of traffic <br />impact mitigation proportionate share calculations based on the Initial Annual Background <br />Growth Rate Assumption determined in Condition C-5, the annual background growth rate <br />assumption shall be revised based on information provided in the monitoring reports required <br />pursuant to Condition C-17. This revised rate shall be calculated for each intersection or road <br />segment monitored based on the change in background traffic at that location over the previous 5 <br />years. The Revised Annual Background Growth Rate ("RBG") shall be recalculated as follows: <br />Suncadia MPR Conditions of Approval <br />December 2, 2008 <br />Page 17