My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-2037 Comp Plan Update Enabling Ordinance with Exhibit A
>
Meetings
>
2019
>
06. June
>
2019-06-18 10:00 AM - Commissioners' Agenda
>
2017-2037 Comp Plan Update Enabling Ordinance with Exhibit A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2019 1:20:58 PM
Creation date
6/13/2019 1:12:11 PM
Metadata
Fields
Template:
Meeting
Date
6/18/2019
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
h
Item
Request to Approve an Ordinance Adopting the 2017-2037 Comprehensive Plan Periodic Update and Associated Maps
Order
8
Placement
Consent Agenda
Row ID
54424
Type
Ordinance
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
413
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Filed for Record 04/16/2009 04:48:53 PM - Kittitas County, WA Auditor- 200904160090 Page 92 of 118 <br />increase in traffic volumes above year 2000 baseline volumes identified in <br />Condition C-5. <br />f. The scope shall also include monitoring of non -holiday summer weekend parking <br />demand in Roslyn and Cie Elum. In addition, local travel patterns of MPR guests will be <br />documented through periodic origin/destination surveys. MPR trips shall be identified as <br />those trips that cross an MPR boundary. <br />g. The monitoring program shall also include a method to reevaluate the background growth <br />assumptions as described in Conditions C-5 and C -5A. <br />h. In addition to the traffic volume monitoring described in subsection (e), the monitoring <br />program shall also include proposed methods to monitor the following potential traffic - <br />related impacts: <br />i. a comparison of the historic road operation and maintenance needs and associated <br />costs prior to MAR construction and development as compared to current road <br />operation and maintenance needs and associated costs (including methods such as <br />review of pre- and post -development pavement management system costs) and the <br />extent to which projected increased revenues from the MPR development are <br />sufficient to cover such increased costs. This assessment may be included either as <br />part of the traffic monitoring program, or as part of a separate fiscal impact <br />monitoring program conducted for government facilities and services more <br />generally; <br />ii. an evaluation, based on accepted guardrail warrant and/or other safety standards, of <br />whether the increased traffic volumes warrant installation of guardrails and/or other <br />safety improvements along portions of Bullfrog road; <br />iii. the need for road segment capacity improvements or new road segments related to <br />MPR traffic at locations other than the intersections previously identified. <br />iv. whether increased traffic volumes or the size or amount of construction traffic <br />related to the MPR development requires improvements to the Cie Elum River <br />Bridge on Bullfrog Road, based on accepted bridge rating standards. <br />V. the increase in airplane use of existing airport facilities (Bowers Field and the Cie <br />Elum airport) by MPR visitors to determine whether MPR visitors are generating a <br />need for facility improvements to accommodate increased aircraft use. <br />i. The monitoring program shall also include a periodic assessment of the pedestrian and <br />vehicular safety at the Cle Elum-Roslyn School campus on SR 903, and shall require <br />mitigation if determined necessary to meet accepted school safety standards. This <br />assessment shall include input from the School District on both the methodology and the <br />results. <br />j. The baseline monitoring information described in Condition C-5 shall be collected on <br />August 25 through September 4, 2000. Subsequent deadlines for monitoring shall be <br />established in the comprehensive traffic monitoring program to be adopted by the <br />County. <br />k. Each required monitoring report shall include, at a minimum, the following information: <br />i, results of any traffic counts <br />ii. development status of the MAR (approved units and occupancy) <br />iii. comparison of MPR development and traffic counts to MPR-FEIS forecasts <br />iv. identification of completed and planned road improvements <br />Suncadia MPR Conditions of Approval Page 24 <br />December 2, 2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.