Laserfiche WebLink
Filed for Record 04/16/2009 04:48:53 PM - Kittitas County, WA Auditor - 200904160090 Page 74 of 118 <br />"This Document" shall reflect to the most current code/codes adopted by the Washington State <br />Building Council and Kittitas County. This will allow buildings to be built with the most current <br />codes applicable rather than the code at approval of the Development Agreement. <br />Flooding. The EIS discusses adverse impacts to lands within the 100 -year floodplain of the Cie <br />Elum River and identifies mitigation measures that should be implemented. Pursuant to Kittitas <br />County SEPA Ordinance Section 15.04.200 (d), Comprehensive Plan Policies GPO 2.193 <br />through GPO 2.195, Comprehensive Plan Sections 2.2(D) and 2.2(E), Shoreline Master Program <br />goal statements, use activity statements, environment designations and shoreline regulations, <br />Flood Damage Prevention Ordinance 93-18, Comprehensive Flood Hazard Management Plan, <br />and KCC section 17A.05, Critical Areas, the following mitigation measures will be required. <br />B-6 Consistent with the MountainStar Resort Conceptual Master Plan (Exhibit B to the <br />Development Agreement) and Land Use Conditions identified below, only the following uses <br />may be developed within the geomorphic floodplain: pervious non -motorized trails (except as <br />allowed in A-7) and other recreational facilities permitted by the Shoreline Master Program; <br />utilities, including stormwater management facilities, sewer and water facilities, and other <br />utilities reflected in the MountainStar application and Final EIS, Appendix A; and a bridge <br />spanning the river and the 100 -year floodplain along with associated approach roads. Approval <br />for these uses shall be contingent on review of the consistency of site-specific development <br />applications with applicable provisions relating to flooding contained within the SMP, Flood <br />Damage Prevention Ordinance and/or Critical Areas Ordinance, and other applicable Kittitas <br />County regulations. Supplemental environmental review shall be required for the bridge <br />spanning the Cle Elum River, to the extent that significant impacts of this element of the MPR <br />are not fully addressed in the EIS for the Master Planned Resort. <br />B-7 Applications for any development within the 100 -year floodplain, as delineated by FEMA, <br />shall describe how any structures will be designed to protect human life and health, result in no <br />net loss of floodplain storage, and be consistent with applicable setback provisions. The <br />development within the floodplain requires "Floodplain development permits" for any work <br />within the FEMA delineated area, which does not allow structures to be built within the <br />floodway. Any development within the floodway shall result in no net loss of floodplain storage. <br />Applications for any development within the 100 -floodplain, as delineated by FEMA, shall <br />describe how any structures will be designed to protect human life and health. <br />B-8 Clearing for approved development within the 100 -year and geomorphic floodplains shall be <br />limited to the minimum necessary to accommodate permitted recreational facilities and to <br />provide access to resort lands on the west side of the Cie Elum River. The design of any <br />approved facilities shall also ensure minimal impacts to the shoreline environment and safe <br />operations during flood events. <br />Groundwater & Stormwater. The EIS discusses adverse impacts to groundwater and identifies <br />mitigation measures that should be implemented. Pursuant to Kittitas County SEPA Ordinance <br />Section 15.04.200(d), Comprehensive Plan Policies 2.194 through 2.195 and 2.210, <br />Suncadia MPR Conditions of Approval Page 6 <br />December 2, 2008 <br />