My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-2037 Comp Plan Update Enabling Ordinance with Exhibit A
>
Meetings
>
2019
>
06. June
>
2019-06-18 10:00 AM - Commissioners' Agenda
>
2017-2037 Comp Plan Update Enabling Ordinance with Exhibit A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2019 1:20:58 PM
Creation date
6/13/2019 1:12:11 PM
Metadata
Fields
Template:
Meeting
Date
6/18/2019
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
h
Item
Request to Approve an Ordinance Adopting the 2017-2037 Comprehensive Plan Periodic Update and Associated Maps
Order
8
Placement
Consent Agenda
Row ID
54424
Type
Ordinance
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
413
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Filed for Record 04/16/2009 04:48:53 PM - Kittitas County, WA Auditor - 200904160090 Page 72 of 118 <br />a means of rapidly transmitting fire from the native growth to any structure will be exempt. <br />A-9 The MountainStar Resort Conceptual Master Plan and the "budget" for land uses include <br />two golf courses on the property. An amendment of the Conceptual Master Plan has been made <br />by the County allowing a third golf course. Supplemental environmental review may be required <br />as provided in the Development Agreement, subject to Kittitas County findings contained in a <br />Planned Action ordinance for the MPR. <br />A-10 The Cle Elum River Corridor shown in Figure 2-2 of the MountainStar EIS shall be <br />managed as Natural Open Space as identified in the EIS and consistent with the Land <br />Stewardship Plan approved by the County pursuant to Conditions A-5 and B-29. <br />B. NATURAL ENVIRONMENT <br />Geology, Soils and Groundwater. The EIS discusses adverse impacts to geology, soils and <br />ground water resources and identifies mitigation measures that should be implemented. Pursuant <br />to Kittitas County SEPA Ordinance Section 15.04.200 (d), Comprehensive Plan Policies GPO <br />2.194, 2.77, 2.78, and KCC 17A.04, 17A.05 and 17A.06, the following mitigation measures will <br />be required. <br />Erosion <br />B-1 To mitigate and reduce sheet and channel erosion, the MPR shall employ Best Management <br />Practices (BMPs) as set forth in the Department of Ecology's then current Stormwater <br />Management Manual for Eastern Washington. BMPs shall include the following measures: <br />(a) Source -control BMPs for cleared areas shall be applied. Surface water runoff will be <br />directed away from exposed subgrades or into approved temporary and/or permanent <br />stormwater conveyance systems. <br />(b) Protective measures for stockpiled soils. <br />(c) Temporary sedimentation traps or ponds. <br />(d) Rock check dams along roadways and within drainage ditches <br />(e) Silt fences shall be established along wetlands, stream and river corridors, open space <br />areas and other sensitive areas. <br />(1) Erosion control measures for stormwater discharge points. <br />(g) Construction runoff shall be collected and treated by sediment ponds, turf -covered sand <br />filters, temporary filtration or other approved methods. <br />(h) Clean water entering construction areas shall not be allowed to mix with construction <br />water. <br />(i) A temporary erosion and sediment control plan (TESCP) shall be established and must be <br />approved by Kittitas County prior to beginning major clearing and earthwork activities, <br />including timber harvest. <br />When a new manual and new BMPs are adopted by Kittitas County, the MPR shall incorporate <br />the new BMPs into the design of any previously unapproved phases of development. Variances <br />may be considered to ensure compatibility between operational and maintenance BMPs <br />Suncadia MPR Conditions of Approval Page 4 <br />December 2, 2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.