My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-2037 Comp Plan Update Enabling Ordinance with Exhibit A
>
Meetings
>
2019
>
06. June
>
2019-06-18 10:00 AM - Commissioners' Agenda
>
2017-2037 Comp Plan Update Enabling Ordinance with Exhibit A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2019 1:20:58 PM
Creation date
6/13/2019 1:12:11 PM
Metadata
Fields
Template:
Meeting
Date
6/18/2019
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
h
Item
Request to Approve an Ordinance Adopting the 2017-2037 Comprehensive Plan Periodic Update and Associated Maps
Order
8
Placement
Consent Agenda
Row ID
54424
Type
Ordinance
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
413
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Filed for Record 04/16/2009 04:48:53 PM - Kittitas County, WA Auditor - 200904160090 Page 71 of 118 <br />A-5 Open space lands shall be managed to buffer sensitive environments from intensive <br />development or activities; to retain and restore native plant communities and to maintain and <br />enhance habitat; and, for developed areas, to provide an aesthetically pleasing landscape, provide <br />habitat connections, and minimize risk of fire. <br />To document and achieve these landscape planning objectives, Trendwest will finalize and <br />submit to the County for approval the existing conceptual Land Stewardship Plan and a Noxious <br />Weed Plan for the entire MPR site prior to any construction and/or land clearing activities for the <br />first phase or subphase of MPR development. An amendment to the Land Stewardship Plan and <br />Noxious Weed Plan shall be submitted to the County for approval with a general site plan or site <br />development plan for any phase or subphase of MPR development if the general site plan or site <br />development plan is inconsistent with such Land Stewardship Plan and/or Noxious Weed Plan. <br />Such amendments shall demonstrate how the goals and policies of the Land Stewardship Plan <br />and Noxious Weed Plan will be implemented for the developed area in the phase or subphase of <br />MPR development covered in the general site plan or site development plan. <br />The Land Stewardship Plan shall include and follow the Department of Natural Resources <br />Backyard Stewardship Program, (Eastern Washington Type) as a model of fire prevention in the <br />interface as a proven working program. The contents of the plan shall be as described in Plants <br />& Animals Conditions B-23 and B-29. <br />A-6 Open space lands shall be retained in a substantially undeveloped state. Development <br />which may occur shall be limited to recreational trails, golf courses, roads and utility facilities <br />required to meet the needs of the MPR. <br />A-7 Lands within the geomorphic floodplain of the Cie Elum River shall remain undeveloped, <br />except as provided herein, and shall protect the resources values and natural functions of the <br />shoreline area. Clearing and disturbance shall be minimized. The following proposed activities <br />may be permitted in the geomorphic floodplain, subject to submittal of appropriate development <br />applications: non -motorized pervious trails, utilities, including a water intake, and a bridge and <br />associated roads spanning the Cie Elum River, provided that impervious trails may be permitted <br />on a case-by-case basis. Additional recreational facilities beyond those identified in the Final <br />EIS, if any, shall be consistent with the Shoreline Master Program and other applicable <br />regulations. Appropriate environmental review, or confirmation that adequate environmental <br />analysis is contained in the MountainStar EIS, shall be conducted for any facilities located within <br />the floodplain and all necessary permits will be obtained by the applicant. <br />A-8 Private Open Space as defined in the MountainStar EIS (approximately 815 acres), which <br />includes the undeveloped portions of lots developed for housing or resort uses may, be included <br />in the calculation of open space for the MPR provided that binding deed restrictions, and/or <br />covenants, conditions and restrictions (CC&Rs) are adopted to limit the amount of clearing and <br />alteration of lots or areas. <br />The amount of clearing on lots shall be consistent with Condition C -25(b). Single specimens of <br />trees, ornamental shrubbery or similar plants used as plant covers, provided that they do not form <br />Suncadia MPR Conditions of Approval Page 3 <br />December 2, 2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.