My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res-2019-082 Road Safety Plan
>
Meetings
>
2019
>
05. May
>
2019-05-21 10:00 AM - Commissioners' Agenda
>
Res-2019-082 Road Safety Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2019 9:23:21 AM
Creation date
5/30/2019 9:22:27 AM
Metadata
Fields
Template:
Meeting
Date
5/21/2019
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
j
Item
Request to Approve a Resolution Adopting the 2019 Kittitas County Safety Plan
Order
10
Placement
Consent Agenda
Row ID
53839
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPENDIX C <br />Engineering Judgment Impacting Project Prioritization of Table 4 <br />1. Priority One- Vantage Highway Corridor Improvements <br />o Vantage Highway guardrail will be noncompliant with the recently RAP funded overlay. <br />Guardrail replacement from MP 21.25 to MP 27.51 is crucial to the safety of the traveling <br />public. Vantage Highway poses a safety risk by not replacing the guardrail. <br />2. Priority Two-Bridg Rall_CUde 3 <br />o Bridges and/or structures with no rail or timber rail were classified as Code 3. Phases are <br />identified by maintenance districts. Some districts had less bridge rail to update and were <br />then grouped with adjacent maintenance districts. <br />3. Priority Three -Bridge Rail -Code 2 <br />o Bridges and/or structures with no approaches or non-crashworthy railing were classified as <br />Code 2. Phases are identified by maintenance districts. Some districts had less bridge rail to <br />update and were then grouped with adjacent maintenance districts. <br />4. Priority Four -Bridge Rail -Cade 1 <br />o Bridges and/or structures with rail that does not meet current standards were classified as <br />Code 1. Following the phase identification process as Priority Two and Priority Six, phases <br />are by maintenance district to create more manageable projects. <br />5. Priority Five -Denmark Rd <br />o The first segment of Denmark Rd MP 0.5 to MP 3.08 scores below a 60 based on our scoring <br />criteria. However this segment does have 4 bridges/structures that have deficient rail, this <br />influenced our decision to include it in the safety plan, and group it with the segment scoring <br />95 from MP 3.08 to MP 4.35. The segment scoring 95 has a curve that needs safety <br />improvements and contains accident history. By doing this we facilitate a project that would <br />provide safety countermeasure to the entire Denmark Rd corridor. <br />6. Priority Six -Clear Zone Inventory <br />o Data collected and analyzed will allow for more efficient project identification in future <br />safety plans. <br />7. Priorit Seven- Intersection Safety Improvements <br />o No. 6 Rd although containing a score of 50 which is below our stated cutoff of 60 was <br />included due to the accidents associated with Vantage highway in the vicinity of said <br />intersection. Kittitas Highway was moved down in priority due to safety improvements <br />recently constructed throughout the corridor. Monitoring of this corridor will continue to <br />track the success of the recently constructed counter measures. <br />8. Priority s=ight-Huntzinger_Rd <br />o Phases identified by milepost instead of total score because all phases are priority 5. <br />Milepost conscious phases allow the county to continue heading south along the corridor <br />following the completion of our safety improvement project in 2017. <br />33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.