Laserfiche WebLink
Priority 2:Brid a Rail Improvements <br />Code 3 <br />V� <br />I <br />D f <br />c <br />■.Wp. aar Ynpnwe■� <br />11�^ a bb 1 Nqs F..& pW NW I DMIkb <br />F D ` D`ndB)Ilk <br />dl■IOL111Y <br />-U■6W A ; <br />+ - BtE�Ui ■ <br />a mmK c <br />i � ■TRKWUll1 D <br />- �pR1M ■ <br />r ��pODT 1' <br />Phase 1 is within County Maintenance Districts A -F with 19 bridges or structures <br />o ESTIMATED COST $595,573 <br />Phase 2 is within County Maintenance District G-1 with 21 bridges or structures <br />o ESTIMATED COST $557,913 <br />Phase 3 is within County Maintenance Districts J -L with 20 bridges or structures <br />o ESTIMATED COST <br />$635,739 <br />• Bridges that have been coded <br />3 are severely inadequate <br />bridges or structures with <br />wood rail or no rail at all. <br />• There will be three projects <br />by geographic location of <br />code 3 bridges to allow for <br />manageable and cost <br />conscious improvements. <br />17 <br />